Help shape GoConqr. What should we add next?

Quiz

V102209 CL 8/5 PUTAR PUTAR CHERABDAY

Wan Din 9 questions

Take the quiz

Questions in this quiz (9)

  1. 143. When making repairs to a stainless steel cladding, the base metal should be checked for
    delayed cracking when the base material is:
    1. AA. P1 or P3.
    2. BB. P1 thru P11.
    3. CC. P1, P3, P4 or P5.
    4. DD. P3, P4, or P5.
  2. 246. A welded repair is made to stainless steel cladding. The vessel's base material is carbon
    steel. The completed weld repair should be examined using:
    1. AA. MT
    2. BB. PT
    3. CC. MT or PT
    4. DD. MT and UT (flaw detection)
    5. EE. PT and UT (flaw detection).
    6. FF. MT or PT, and UT (flaw detection).
  3. 347. A welded repair is made to stainless steel cladding. The vessel's base material is a P-4
    steel. The completed weld repair should be examined using:
    1. AA. MT
    2. BB. PT
    3. CC. MT or PT
    4. DD. MT and UT (flaw detection)
    5. EE. PT and UT (flaw detection)
    6. FF. MT or PT, and UT (flaw detection).
  4. 448. A vessel with P-5 base material is clad with stainless steel. During the turnaround,
    welded repairs are made to the cladding. UT flaw detection of the repair area:
    1. AA. is not required
    2. BB. must be done before welding is performed.
    3. CC. must be done immediately after welding is completed
    4. DD. must be done, but after waiting 24 hours.
    5. EE. must be done, by a technician certified to EPRI
  5. 560. During a vessel repair or alteration, when can preheating be used as an alternative for
    postweld heat treating?
    1. AA. For P 1 & P3 materials
    2. BB. For Pl, P3 & P4 materials
    3. CC. For P3, P4 and P5 materials
    4. DD. For P1 through Pll materials
    5. EE. Whenever the inspector reviews and approves the procedure
  6. 664. During a vessel repair or alteration, when can controlled deposition welding be used as an
    alternative for postweld heat treating?
    1. AA. For PI & P3 materials
    2. BB. For Pl, P3 & P4 materials
    3. CC. For P3, P4 and P5 materials
    4. DD. For Pl through Pll materials
  7. 765. Welding is performed on an in-service vessel. What welding processes can be used when
    using controlled deposition welding as a substitute for postweld heat treating?
    1. AA. Only SMAW
    2. BB. Only SMAW and SAW
    3. CC. Only SMAW and GMAW
    4. DD. Only SMAW and GTA W
    5. EE. Only SMAW, GMAW and GTAW
    6. FF. Only SMAW, SAW, GMAW and GTAW
    7. GG. Any welding process provided the engineer approves
  8. 861. Welding is performed on an in-service vessel. What welding processes can be used when
    using preheat as a substitute for postweld heat treating?
    1. AA. Only SMAW
    2. BB. Only SMAW and SAW
    3. CC. Only SMAW and GMAW
    4. DD. Only SMAW and GTAW
    5. EE. Only SMAW, GMAW and GTAW
    6. FF. Only SMAW, SAW, GMAW and GTAW
    7. GG. Any welding process provided the engineer approves
  9. 969. A corroded area in a carbon steel vessel is being repaired by using weld overlay (weld
    build-up). The vessel surface should be examined by:
    1. AA. MT or PT before welding.
    2. BB. MT or PT after welding.
    3. CC. MT or PT both before and after welding.
    4. DD. MT or PT after welding, and UT flaw detection after 24 hr
    5. EE. MT or PT both before and after welding, and UT flaw detection after 24 hrs

Information

Description
Quiz on V102209 CL 8/5 PUTAR PUTAR CHERABDAY, created by Wan Din on 22/09/2021.
Author
Wan Din
Language
English
Views
1
Tags
ca
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What should we add next?