  1. Types of Resource Constraints

    • People
    • Equipment
    • Materials
  2. Splitting Activities

    • Splitting - a schedule technique in which work is interrupted on 1 activity & the resource is assigned to another for a period of time, then reassigned to original activity
  3. Classifications of Scheduling Problem

    • Time-constrained project - assumes time is fixed & if resources are needed
    • Resource-constrained project - assumes resources are limited (fixed) & time is variable
  4. Resource Allocation Methods

    • Assumptions
      • Splitting activities won't be allowed
      • Level of resources used for an activity cannot be changed
    • Time-Constrained Projects: Smoothing Resource Demand
      • Focuses on resource utilization
      • Leveling - techniques used to examine a project for an unbalanced use of resources & for resolving resource overallocations
      • Downside of leveling is a loss of flexibility that occurs from reducing slack
    • Resource-Constrained Project
      • Heuristics - rule of thumb used to make decisions
      • Parallel method is the most widely used approach to apply heuristics
      • Priority rules; 1. minimum slack, 2. smallest duration, 3. lowest activity identification number
  5. Computer Demonstration of Resource-Constrained Scheduling

    • Time-limited (constrained) bar chart incorporates the same info used to develop the project network
    • Resource usage chart - this segment represents the peak requirement for design engineers for the project
    • Limited resource schedule reduces slack & flexibility & increases the number of critical & near-critical activities
  6. Benefits of Scheduling Resources

    • Failure to schedule limited resources can lead to serious problems for project manager
    • Benefit of creating schedule before the project begins leaves time for considering reasonable alternatives
  7. Multiproject Resource Schedules

    • Common problems;
      • 1. Overall Schedule Slippage - delays in 1 project can have a ripple effect & delay other projects
      • 2. Inefficient Resource Utilization - projects have different schedules & requirements
      • 3. Resource Bottlenecks - delays & schedules are extended as a result of shortages of critical resources that are required by multiple projects

Informationen

Beschreibung
Mindmap am Chapter 8, erstellt von Tiffany Lloyd am 30/10/2018.
Erstellt von
Tiffany Lloyd
Aufrufe
0
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck