Quiz
IS2.13
Create a free account to finish this quiz
Save your progress and see your final score.
Already have an account? Sign in
Questions in this quiz (20)
1The purpose of configuration change control is?
- ATo maintain the integrity of the product in all of its states
- BBeing able to track
- CBe constituents or compounds
- DHave complete control of the system
- EMake change in their development
- FManage of different processes or sets of tools
2The following types of items are the minimum that shall be subject to change control:
- AConstituent CIs as they participate in larger components
- BEach configuration baseline as a separately identified configuration item
- CSpecification of the environment and tool chains used in producing the baseline
- DThe lines of code must be identified and used in the development
- EEstablish forms in the change request
- FDesignate items subject to change control
3A change request form shall be established with at least the following standard fields:
- ADescription of proposed change and rationale/purpose
- BState of the change
- CAffected baseline
- DOutcome of analysis of impact on the project
- EResolution
- FApprovals
4For controlling constituent configuration items, the following attributes shall be available in the CMDB for each change request:
- AOriginator
- BImpact analysis
- CRationale and approval
- DNotification
- EReversibility
- FSet of Changes
5What Is Software Quality?
- AQuality must be defined and measured if improvement is to be achieved
- BIt is a multidimensional concept
- CComposed of levels of abstraction
- DPopular use language
- EIs responsible for capturing what one thinks
- FSeries of steps leading to an end
6The narrowest sense of product quality is commonly recognized as?
- ALack of "bugs" in the product
- BBottleneck
- CMistakes in production
- DMistakes in the product
- EThe lacks of "errors" in production
- FAccumulated tasks
7To increase overall customer satisfaction as well as satisfaction with various quality attributes, the quality attributes must be taken into account?
- AThe planning and design of the software
- BThe analysis and the result
- CThe development
- Donly planning
- EThe result and development
- FThe software design and result
8The exponential model is another special case of the Weibull family, with the shape parameter m equal to:
- A1
- B2
- C0
- D3
- E-1
- F-2
9What does CDF and PDF mean?
- ACumulative distribution function and Probability density function
- BUpdated development function and Project development function
- CCumulative distribution factor and practice distribution function
- DCumulative design function and project design function
- Ecumulative distribution function and designated probability factor
10How many models of software reliability modeling have been proposed?
- AMore than one hundred models have been proposed in professional journals and in software conferences
- BMore than a thousand models were created based on the other models
- CMore than a thousand models have been proposed in professional journals and software conferences
- DMore than five hundred models have been proposed in professional journals and software conferences
- ENo more than fifty models have been proposed in professional journals and software conferences
- FNo more models have been proposed in professional journals and software conferences
11Software reliability growth models can be classified into two major classes
- Adepending on the variable
- Bdepending of the model
- Cdepending on the analysis
- Ddepending on the design
- Edepending on the development
- Fdepending on the result
12They are reliability growth models:
- AJelinski-Moranda Model
- BLittlewood Models
- CGoel-Okumoto Imperfect Debugging Model
- DGoel-Okumoto Nonhomogeneous Poisson Process Model
- EMusa-Okumoto Logarithmic Poisson Execution Time Model
- FThe Delayed S and Inflection S Models
13The basic assumptions of the fault count model are as follows (Goel, 1985):
- ATesting intervals are independent of each other
- BTesting during intervals is reasonably homogeneous
- CNumbers of defects detected during non overlapping intervals are independent of each other
- DAll faults contribute equally to cause a failure
- EFix time is negligible
- FFix is perfect for each failure; there are no new faults introduced during correction
14Los criterios para la evaluación del modelo son los siguientes:
- AValidez predictiva
- BCapacidad
- CCalidad de los supuestos
- DAplicabilidad
- ESencillez
- FEscalabilidad
15The metrics in the analysis include:
- AFan-in
- BFan-out
- CMcCabe's cyclomatic complexity index (CPX)
- DNumber of INCLUDES in the module
- EPrevious defect history
- FDefect level in the current system
16Los sistemas de gestión de versiones ofrecen a menudo varias características:
- AIdentificación de versión y entrega
- BGestión de almacenamiento
- CRegistro del historial de cambios
- DDesarrollo independiente
- ESoporte de proyecto
- FSoporte técnico
17Al comparar las firmas en los archivos de código fuente y objeto, es posible decidir si el componente del código fuente se usó para generar el componente de código objeto.Hay dos tipos de firmas que pueden usarse:
- AModificación de marca de tiempo
- BSumas de verificación de código fuente
- CValidación del codigo utilizado
- DModificación del codigo objeto
- ESumas realizadas en el codigo objeto
- FModificación del codigo fuente
18Cuáles son los principales procesos de administración de la configuración?
- AAdministración del cambio
- BGestión de versiones
- CConstrucción del sistema
- DGestión de entregas de software
- EPlanificación del diseño
- FAdministración del análisis realizado
19Qué es la construcción de un sistema?
- AProceso de ensamblar componentes de sistema en un programa ejecutable
- BPasos que deben seguirse para realizar el sistema
- CCrear los elementos necesarios para su construcción
- DHacer una estandarización
- EProceso que nos da como resultado un sistema
- FPasos que se realizan en un momento determinado
20Las entregas de sistema contienen:
- ACódigo ejecutable
- BArchivos de datos
- CArchivos de configuración
- DDocumentación
- EDiseño de la interfaz
- FAnálisis realizado
Information
- Description
- Quiz on IS2.13, created by Leandro Ramos Valdéz on 11/07/2018.
- Author
- Leandro Ramos Valdéz
- Language
- English
- Views
- 2
- Rating
- No ratings yet Rate this quiz