Exams · US

BCBA practice questions: Schedules and stimulus control

Schedules of reinforcement, extinction and its temporary burst, stimulus control and generalization.

15 questions · 14 key rules

Updated 17 November 2026 for the current outline, Ethics Code and BCBA Handbook

Sample questions

Tap a question to see the answer and the rule behind it.
  1. Schedules and control1. A learner receives a token after every 5 completed math problems. Which schedule is in effect?
    1. Fixed-interval schedule
    2. Variable-ratio schedule
    3. Variable-interval schedule
    4. Fixed-ratio schedule
    Show answer and explanation

    Answer: D. Fixed-ratio schedule

    A fixed-ratio schedule delivers reinforcement after a specified number of responses. Here, the requirement is always 5 completed problems.

    Why the others are wrong

    • Fixed-interval schedule: Fixed interval requires a response after a set amount of time.
    • Variable-ratio schedule: Variable ratio requires a changing number of responses.
    • Variable-interval schedule: Variable interval requires a response after a changing amount of time.

    Source: BACB, BCBA Test Content Outline, updated 09/2024: the 104 tasks in domains A-I; settled concepts, principles…, Domain B. Concepts and Principles (24 scored questions)

  2. Schedules and control2. A learner earns tokens after completing 2, then 6, then 4 tasks. The task requirement varies around an average of 4. Which schedule is in effect?
    1. Fixed ratio 4
    2. Variable interval 4
    3. Fixed interval 4
    4. Variable ratio 4
    Show answer and explanation

    Answer: D. Variable ratio 4

    A variable-ratio schedule requires a varying number of responses for reinforcement. The three requirements average 4 tasks: (2 + 6 + 4) ÷ 3 = 4.

    Why the others are wrong

    • Fixed ratio 4: Fixed ratio 4 requires 4 tasks for every token.
    • Variable interval 4: Variable interval uses changing time requirements, not task counts.
    • Fixed interval 4: Fixed interval uses a constant time requirement, not a task count.

    Source: BACB, BCBA Test Content Outline, updated 09/2024: the 104 tasks in domains A-I; settled concepts, principles…, Domain B. Concepts and Principles (24 scored questions)

  3. Schedules and control3. A client can work on either a puzzle or a sorting task. Each task has its own reinforcement schedule, and both are available at the same time. Which schedule arrangement is this?
    1. Multiple schedule
    2. Chained schedule
    3. Mixed schedule
    4. Concurrent schedule
    Show answer and explanation

    Answer: D. Concurrent schedule

    A concurrent schedule offers two or more reinforcement schedules at the same time. The client can allocate responding between the available alternatives.

    Why the others are wrong

    • Multiple schedule: A multiple schedule alternates signaled components.
    • Chained schedule: A chained schedule requires components in sequence before reinforcement.
    • Mixed schedule: A mixed schedule alternates components without distinct signals.

    Source: BACB, BCBA Test Content Outline, updated 09/2024: the 104 tasks in domains A-I; settled concepts, principles…, Domain B. Concepts and Principles (24 scored questions)

  4. Schedules and control4. A teacher alternates between two reinforcement schedules for a client's work. A blue card is present during one schedule and a yellow card during the other. What arrangement is this?
    1. Mixed schedule
    2. Concurrent schedule
    3. Multiple schedule
    4. Chained schedule
    Show answer and explanation

    Answer: C. Multiple schedule

    A multiple schedule alternates reinforcement schedules, each associated with a distinct stimulus. The colored cards signal which schedule is currently operating.

    Why the others are wrong

    • Mixed schedule: A mixed schedule alternates components without distinct signals.
    • Concurrent schedule: A concurrent schedule makes alternatives available at the same time.
    • Chained schedule: A chained schedule requires components in sequence before reinforcement.

    Source: BACB, BCBA Test Content Outline, updated 09/2024: the 104 tasks in domains A-I; settled concepts, principles…, Domain B. Concepts and Principles (24 scored questions)

  5. Schedules and control5. A client presses a lit button, which turns on a second light. Pressing the newly lit button then produces a token. Both responses are required in that order for each token. Which schedule arrangement is this?
    1. Concurrent schedule
    2. Mixed schedule
    3. Multiple schedule
    4. Chained schedule
    Show answer and explanation

    Answer: D. Chained schedule

    A chained schedule requires completion of successive components before the final reinforcer is delivered. Distinct stimuli signal the components in the sequence.

    Why the others are wrong

    • Concurrent schedule: A concurrent schedule offers alternatives simultaneously.
    • Mixed schedule: A mixed schedule alternates components without distinct signals.
    • Multiple schedule: A multiple schedule alternates signaled components without requiring their completion in sequence.

    Source: BACB, BCBA Test Content Outline, updated 09/2024: the 104 tasks in domains A-I; settled concepts, principles…, Domain B. Concepts and Principles (24 scored questions)

Sign up free

Other BCBA topics

GoConqr Original. Practice questions written with AI from the BCBA Test Content Outline and the Ethics Code for Behavior Analysts, each checked by a separate AI review. Think a question is wrong? Use 'Report' under it.

Independent study resource. Not affiliated with or endorsed by the Behavior Analyst Certification Board. BCBA, BACB and Board Certified Behavior Analyst are marks of the BACB.

© Visual Maths Resources Ltd

Feedback

What is it about?