Updated 11 November 2026 for the rules in force now. The 5 December 2026 handbook changes are listed below.
COSS mock test: free revision questions for Controller of Site Safety
Know what to fix before assessment day: a free 15-question COSS check, with the rule and handbook section behind every answer.
- topics covered, 294 explained questions
- 10
- questions in each timed practice test
- 30
- score to aim for (real pass mark not published)
- 80%
Quick check
Unlock 110 more free questions
Make a free account to keep going. We save your score by topic, so you can pick up where you left off. Your answers so far are kept.
Already have an account? Sign in
How to prepare
-
See what to fix first Free
-
Make the rules stick Free account
-
27 questionsThe COSS role and competence Who does what on site (COSS, IWA, PC, PIC), the key terms, competence and the Sentinel rules.
-
27 questionsPlanning and the safe work pack The Person in Charge, RT9909 and NR3180, site familiarity and hazards, and not starting without a safe system.
-
35 questionsWalking, crossing and moving a group Walking alone and in a group, 3 metres from an open line, the Crossing the Line procedure, joining and leaving.
-
41 questionsChoosing the safe system of work Safeguarded, fenced, separated and warning systems, barrier distances, site wardens, and stopping work when protection fails.
-
22 questionsLookouts, site wardens and warning times When lookout warning is allowed, the 25 mph limit, positions of safety and the 10 seconds' warning.
-
42 questionsLine blockages and the protection controller Blocking a line through an authorised arrangement, the protection controller and the NR3180 form.
-
40 questionsPossessions, work sites and sidings Possessions, work sites and sidings, including the transient work sites due on 5 December 2026.
-
11 questionsThe COSS briefing and communication Safety-critical messages, lineside signs and the COSS briefing.
-
25 questionsElectrified lines Working on or near electrified lines as a COSS, and what to check before the group starts.
-
24 questionsTrolleys, emergencies and incidents Hand trolleys on the line, emergencies, and reporting incidents and close calls.
-
-
COSS Prep Pass
Walk in ready for your COSS
Start free to see your weak topics. The Prep Pass gives you the practice to close those gaps before exam day.
- All 294 questions across 10 topics
- Timed practice tests: 30 questions in 40 minutes
- Mistakes review: practise what you got wrong
- Your progress saved on phone and computer
-
Turn misses into marks Prep Pass
-
Fix your weakest topic first Prep Pass
-
Practise under time pressure Prep Pass
COSS at a glance
The assessment
Theory, practical and verbal
Questions and time
Not published
Pass mark
Not published
Course length
6 to 8 days, recert 2 to 4
Validity
2 years
Sample COSS questions
1. A lineside warning system is operated by a lookout to warn your group about approaching trains. What is it called?
- A proceed-on-sight authority (PoSA)
- A lookout operated warning system (LOWS)
- An intermediate block home signal
- A block marker
Answer: B. A lookout operated warning system (LOWS)
LOWS is a lineside warning system operated by a lookout. It warns personnel on or near the line about approaching trains.
- A proceed-on-sight authority (PoSA): PoSA is a signal used for movements into a section affected by a signalling equipment failure.
- An intermediate block home signal: An intermediate block home signal controls the exit from an intermediate block section.
- A block marker: A block marker indicates a signalling section within ERTMS.
Source: GERT8000-GLOSSARY Glossary of railway terminology, Glossary terms
2. You are COSS at a location listed in the Sectional Appendix. What does TOWS do when switched on?
- Stops an approaching train before it reaches the group
- Warns the signaller when the group enters the line
- Warns people on or near the line audibly when a train approaches
- Shows the group a visual indication that the line is blocked
Answer: C. Warns people on or near the line audibly when a train approaches
TOWS is an audible warning system that warns personnel on or near the line about an approaching train. It gives a warning rather than stopping the train.
- Stops an approaching train before it reaches the group: TOWS gives an audible warning; it does not stop the train.
- Warns the signaller when the group enters the line: TOWS warns personnel about approaching trains, not the signaller about the group.
- Shows the group a visual indication that the line is blocked: TOWS provides an audible train warning, not a visual line-blockage indication.
Source: GERT8000-GLOSSARY Glossary of railway terminology, Glossary terms
3. You are planning a fenced site of work using netting. Trains on the nearest open line travel at 60 mph. What is the minimum distance between the netting and that line?
- 1 metre
- 1.25 metres
- 2 metres
- 2.5 metres
Answer: C. 2 metres
At speeds from 41 to 125 mph, netting or tape must be at least 2 metres from the open line. The required distance depends on the barrier type and train speed.
- 1 metre: 1 metre is less than the specified minimum.
- 1.25 metres: 1.25 metres is the minimum for netting at speeds up to 40 mph.
- 2.5 metres: 2.5 metres is greater than the specified minimum.
Source: Network Rail keypoint card: COSS, IWA, PC (Issue 12
4. You are setting up temporary fencing along a work site. The group needs to cross the line at one point. How should the fencing be arranged?
- Leave a gap wherever workers need access
- Fence only the sections closest to the line
- Keep it continuous, except for a proper crossing break
- End the fencing on each side of the crossing area
Answer: C. Keep it continuous, except for a proper crossing break
Temporary fencing must run continuously along the site, except where a proper break allows people to cross the line. This maintains an effective barrier while providing a crossing point.
- Leave a gap wherever workers need access: An informal gap does not provide the required proper break.
- Fence only the sections closest to the line: Fencing must extend along the whole site, not just selected sections.
- End the fencing on each side of the crossing area: Ending the fencing on both sides does not establish a proper break.
Source: Network Rail keypoint card: COSS, IWA, PC (Issue 12
5. A group member who is not acting as a COSS or IWA needs to walk alone to the site where the rest of the group is working. Under the COSS permission route, what must happen first?
- The group member must obtain permission from the signaller.
- The COSS must tell the group member they can make the walk.
- The group member must arrange a line blockage.
- The COSS must accompany the group member to the site.
Answer: B. The COSS must tell the group member they can make the walk.
A person who is not acting as a COSS or IWA may walk alone to or from the group’s work site if a COSS has told them they can. They must carry out the COSS’s instructions.
- The group member must obtain permission from the signaller: The rule specifies permission from a COSS, not the signaller.
- The group member must arrange a line blockage: A line blockage is not specified as a condition for this walk.
- The COSS must accompany the group member to the site: The rule allows the person to walk alone with the COSS’s permission.
Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, General
6. A member of your group wants to leave and carry out a separate task alone. Who may work alone under this rule?
- A person acting as a COSS or IWA
- Any group member with a valid PTS certificate
- Any group member who has received a COSS briefing
- A person authorised by another group member
Answer: A. A person acting as a COSS or IWA
A person must not work alone unless they are a COSS or IWA. PTS or a group briefing alone does not meet that condition.
- Any group member with a valid PTS certificate: A PTS certificate alone does not permit someone to work alone.
- Any group member who has received a COSS briefing: A COSS briefing alone does not permit someone to work alone.
- A person authorised by another group member: Another group member’s authorisation does not replace the COSS or IWA requirement.
Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, General
7. You are COSS for a group working on or near the line. What must you do while the group is there?
- Leave once everyone has signed the form
- Return only when a train approaches
- Stay with the group
- Leave if the group has an experienced worker
Answer: C. Stay with the group
The COSS must stay with the group while they are on or near the line. Signing the form does not replace the COSS's presence.
- Leave once everyone has signed the form: Signing the form does not permit the COSS to leave.
- Return only when a train approaches: The COSS must stay with the group, not just return for trains.
- Leave if the group has an experienced worker: An experienced worker does not replace the COSS.
Source: GERT8000-HB1 General duties and track safety for track workers (Iss 9, COSS must be present
What changed, and when
Network Rail recertification became a two-day course.
New issues came into force: HB8 Issue 10 (line blockages) and HB6 Issue 8 (working alone).
New issues came into force: HB7 Issue 10 (COSS duties), HB9 Issue 9 (possessions), HB12 Issue 11, T3 Issue 13, HB1 Issue 9, HB3 Issue 4 and HB5 Issue 3.
New issues came into force: HB16 Issue 7 (AC electrified lines) and HB17 Issue 6 (DC electrified lines), with Briefing Leaflet 43.
HB6 Iss 9 (section 3.2) and HB7 Iss 11: no more patrolling, inspecting or examining without a safe system of work.
HB9 Iss 10: RT3199 is no longer signed with the ES, and 'transient work sites' between two work sites are introduced. The section 3.6 equipment warning in a possession is withdrawn.
HB12 Iss 12, HB11 Iss 12 and T3 Iss 14 allow engineering controls as an alternative to detonator protection, and cover transient work sites. HB1 Iss 10 adds a balise warning (section 7.8).
One provider, Tec Training, asks for 10 COSS shifts for recertification, in place of 4 logged trackside shifts in 12 months.
How these questions are made
Written from the official sources
Checked against the source
Resitting or recertifying?
Recertification is a shorter course, 2 to 4 days, and also includes delivering a briefing. Network Rail recert has been two days since 1 January 2021. Your provider books it and records the result on Sentinel.
If your notes pre-date 5 December 2026, check the changes above. The new handbook issues affect patrolling and inspecting, possessions and transient work sites, and detonator protection.
Quizzes by other learners
Frequently asked questions
Is there a free COSS mock test with answers?
Yes. Revision questions by topic are free; the timed 30-question mock (40 minutes) comes with Premium. Each answer shows the Rule Book handbook or Network Rail source behind it.
Are these the real COSS exam questions or a COSS exam questions PDF?
No. The real theory assessment questions are not published, and this is not a PDF download. These are original practice questions written from the Rule Book handbooks and Network Rail guidance, each with its source.
What is the COSS assessment like?
The course ends in a theory assessment plus practical (scenario) and verbal assessments, run by a Network Rail-approved training provider. Recertification also includes delivering a briefing.
What is the COSS pass mark and how many questions are there?
Neither is published. No provider or Network Rail page gives a pass mark, question count or time limit for the theory assessment. You are assessed against Network Rail's competence standard, so we suggest aiming for 80% or more on our mock.
What is a COSS?
The Controller of Site Safety sets up and keeps a safe system of work for a group of two or more people working on or near the line on Network Rail managed infrastructure. A COSS may also act as an IWA.
How long is the COSS course, and how long does competence last?
Initial courses run 6 to 8 days depending on the provider, and recertification runs 2 to 4 days. After a 4-month probationary period and a workplace assessment, competence is valid for 2 years, with an interim workplace assessment at 9 to 15 months.
What do I need before I can take the COSS course?
You need to be 18 or over, hold a valid Sentinel card with PTS (DCCR for CRP), pass the Network Rail medical and drug and alcohol test, have a primary sponsor, and have 4 logged trackside shifts in 12 months. From 5 December 2026, Tec Training asks for 10 COSS shifts for recert.
What changes for COSS on 5 December 2026?
New handbook issues take effect, including HB6 Iss 9, HB7 Iss 11, HB9 Iss 10, HB12 Iss 12, HB11 Iss 12, T3 Iss 14 and HB1 Iss 10. Changes include no patrolling or inspecting without a safe system of work, and transient work sites.