Help shape GoConqr. What should we add next?

Flashcards

Standard Costing Reivew Notes

Kevhvan Graham Accounting Level 3 English 8 cards

Cards in this deck (8)

  1. 1YIELD RATIOThe Yield Ratio is calculated using the following formula:
    ( Standard yield/ Total standard input)* 100
  2. 2Standard Cost per unit of yieldThe Standard Cost per unit of yield is calculated using the following formula:
    Total standard cost/ Standard yield
  3. 3Yield VarianceThe yield variance is calculated using the following formula:
    (Actual yield- Expected yield)* total standard cost/unit of yield
  4. 4Direct Material Usage VarianceThis variance is found using the formula:
    Direct Material Mix Variance + Yield Variance
  5. 5Expected UsageFormula:
    Actual yield/yield ratio
  6. 6Expected yieldFormula:
    Actual yield * yield ratio
  7. 7What are Ideal StandardsIdeal Standards are standards which demand maximum efficiency and usually require operations to run perfectly (maximum output at minimum cost) There is no allowance for idle time, production delays or machine breakdowns. Management sometimes uses ideal standards, but only for short periods of time. Even though ideal standards yield great results, they are unfavorable to staff members and can lead to a decline in performance
  8. 8What are currently attainable standardsCurrently, attainable standards are standards that can be achieved with a reasonable level of effort under efficient operating conditions. They include allowances for normal loss, machine breakdowns, maintenance and idle time. They are good for controls as they provide motivation by giving employees realistic and achievable targets

Information

Description
Level 3 Accounting (Standard Costing (Review Notes)) Flashcards on Standard Costing Reivew Notes, created by Kevhvan Graham on 18/04/2021.
Created by
Kevhvan Graham
Views
0
Tags
standard costing formulas and discussion notes
Rating

More on Material and Labour Variances

Feedback

What is it about?

What should we add next?