Process and operations management

Tom Duncan English 19 cards

Cards in this deck (19)

  1. 1POM is focused ontechniques that limit the incidence and consequence of supply-demand mistmatches
  2. 2Course outline: first componentBusiness process analysis and improvement - analyze, improve and design internal firm activities
  3. 3Course outline: second componentSupply chain management - sourcing raw materials and delivering goods
  4. 4Goals of better POM1. Throughput higher
    2. Inventory lower
    3. Operational cost lower
  5. 5Main implications of a bottleneck1. You are only as fast as your bottleneck [bn]
    2. Mistakes after bn very costly
    THERFORE
    1. Place auditors before bn
    2. Six sigma after
  6. 61. What is throughputThe rate at which the system generates sales/revenue
    Production is not revenue
    Revenue = min[production, demand]
  7. 72. What is operating expense?The rate at which the system generates costs
  8. 83. What is inventoryThe level of capital invested in the system
  9. 9The systemOperating expense = $ going in the system
    Inventory = $ sitting in the system
    Throughput = $ coming from the system
  10. 10Operational measures as financial measures1. NOPAT = throughput - operating expenses
    2. EVA = NOPAT - (WACC x inventory)
    3. ROIC = NOPAT/Inventory = (NOPAT/COGS)x(COGS/Inventory)
  11. 11Symptoms of a bottleneckResource with min capacity
    Resource which is always busy
    Resource with longest wait
    Resource with most inventory
  12. 12Improving bottlenecksAny improvement in bn capacity increase system capacity
    Lost capacity at bn is lost for the system
    Always use bn fully
  13. 13Improving bn'sStrategies
    Offload work to non-bn steps (contract out steps)
    Create inventory buffer before bn to avoid starving
    Quality check before bn
    Increase capacity by reducing number of batches - reduces setups
  14. 14Improving inventory managementNeed inventory at bn's
    Min inventory and non-bn's
    Reduce batch sizes at non-bns
    Bn early in the process simplify flow management
  15. 15ID the bnStep1 Step2 Step3 etc
    Service time [e.g. minutes/unit]
    Capacity [e.g. units/hour]
    Bottleneck [which step lowest capacity]
    Bottleneck capacity
    System capacity [=bn capacity]
    Utilization at max capacity [of each step]
    Benefit of additional resources [only at bn]
  16. 16What is batchingBatch processes with set up time
    E.g. baking cookies more efficient all at once
  17. 17Larger batches leads toCapacity = Q / B + QxP
    Larger batches = more capacity
    Inventory costs will increase linearly with Q
    So increase batch size increases throughput but also increase inventory costs
  18. 18Batch size prescriptionsAt bn steps - use large batch sizes to increase throughput
    At non-bn steps use smaller batch sizes and focus on reducing costs
  19. 19Summary approachIdentify the goal
    Identify the obstacles to achieve it
    Manage the bn's

Information

Description
Flashcards on Process and operations management, created by Tom Duncan on 23/05/2015.
Created by
Tom Duncan
Views
3
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?