  1. 1So how does the design team accomplish the task? There are usually 3 stages1. Schematic Design- emphasis is placed on the design
    2. Design Development- emphasis is placed on decision-making
    3. Construction Documentation –emphasis on documentation
  2. 2Design-Build (DB) advantagesintegration of design & construction, fewer change orders, single point of responsibility, faster project completions
  3. 3Design-Build (DB) disadvantagesOwner loses control once the contract has
    been awarded. Thus… Project must by meticulously defined before award
  4. 4The process by which a building is delivered to it’s owner may be divided into phases:Predesign (Planning)
     Design
     Preconstruction (Bid)
     Construction
     Postconstruction
  5. 5Important Predesign tasks include:Building Program Definition
     Economic Feasibility Assessment
     Site Assessment and Selection
     Governmental constraints assessment
     Design team selection.
  6. 6The Owner normally gets the architect to engage with the surveyor & geotechnical engineer. True or false?False. The Owner normally engages the surveyor & geotechnical engineer directly
  7. 7The Architect is liable to thethe owner for his or her work and
    also that of the consultants
  8. 8What is the design's team challenge?effectively produce the graphics and text that communicates the design intent to the general contractors, subcontractors, product suppliers &manufacturers
  9. 9What is the most commonly used format in Canada?Masterformat
  10. 10This Uniform Construction Index was first published in 1972 by?the CSI from earlier versions published by the AIA
  11. 11What is the general constructor (GC's) key function?the overall management of construction
  12. 12True or false: Essential features of construction and post construction phases are almost identical in all delivery methods?True
  13. 13How are GC's chosen?through competition
  14. 14What is open bidding?Qualified bidders are invited through ads etc.
    GC’s bid is based on information provided in the bidding documents
  15. 15What is closed bidding?Owner preselects GC’s
    The selected contractors are then invited to bid of the project; and Contractor with the lowest bid is then awarded the contract.
  16. 16What do Surety bonds do?eliminate financial risks of construction
  17. 17Before fabrication, the fabricator does what?submits the shop drawings to the GC who reviews them for approval and then submits them to Architect for review/approval.

Information

Description
level 2 Materials & Mehods 2 Flashcards on Overview Building Delivery Process , created by Ashleigh Picken on 07/04/2016.
Created by
Ashleigh Picken
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?