- 1What are the three different configurations of the safe framework?Essential, three level, Four level
- 2What are the four levels of safe?Team, Program, value stream, portfolio. Plus a supporting foundation element
- 3Among the levels, which is the heart of safe?The program level because that is centered around the Agile release train
- 4How is value delivered in safe? And why in this way?By the Agile release train
Bcs ea REALIZES a portion of the value stream and ...
ACCELERATES it by implementing lean Agile practices
Point – it's organized around a value stream - 5What are the key highlights of the program level?– Aligns to a common mission single vision, roadmap, Program backlog
– Delivers features and enabler's/infrastructure
– Synchronizes all iterations to same start/and dates
– Use this program increments as fixed time blocks for planning, execution, inspecting, adapting
– Roles: teams, project management, System architect, release train engineer
- Demo synchronizes work, all teams on the train
- Ultimate measure of progress is continuous integration
– art uses face-to-face PI planning key for alignment/edit Tatian
– art Builds Dev ops pipeline for a continuous development and release of small increments of value
– A RT provides consistent approach is to UX - 6When can Program level solutions be released?During or at the end of the PROGRAM INCREMENT based on the needs of the business
Does not have to be just at the end - 7What are the four key ART roles? And then what is the additional role?Agile teams
Product management
System architect/engineering
Release train engineer who is cheif scrum master for the train
Business owners are also part of the Agile release train - 8What is WSJF? Weighted Shortest Job First?Technique for backlog prioritization,
BASED ON ECONOMIC prioritization - 9What is the formula to calculate WSJF?WSJF = (User Value + Time Criticality + Risk Reduction or Opportunity Enablement Value) / Job Size
- 10Cost of WHAT...is the core concept of WSJF?Cost of delay
- 11How do you calculate the Cost of Delay?(User Value + Time Criticality + Risk Reduction or Opportunity Enablement Value)
- 12What's the mneumnic for CoD? Cost of Delay?Uterine Rick
User value + Time Criticality + RickRisk Reducation / Opportunity Enhancement - 13Why does the art make it unnecessary to reorg?Because it's both:
1. VIRTUAL
2. An ORGANIZATION!
a "VIRTUAL Org" - 14What is the mistake P made around transparency that safe does better?Transparency – P did not even have that at the team level, much less the program/category or portfolio level.
- 15What are the impacts of transparency?Decentralized decision-making
Trust
Empowerment
Engagement - 16How are I&A workshops supportive versus scary for arts?I need to find out and defined these
- 17What was a key P a mistake around program performance?Tried to make program performance successful only through bottom up
- 18How are value streams implemented?By an Art
- 19What is an art?A virtual organization across functional silos to accelerate delivery
- 20What two key activities does the portfolio level do?Fund and govern
- 21What is the pneumonic for the portfolio level activities?A portly, fun Governor
- 22What is the spanning palette?An artist palette that contains various:
Roles
Artifacts...
… That may be applicable to a specific:
Team
Program
Value stream
Portfolio context - 23What is the pneumonic for spanning palette?Spam
- 24Why is the spanning pallet an element contributing to safe's flexibility and configurability?Because only the elements needed for each level are applied.
The organization decides - 25What two things does the program level deliver?Features and enabler's
- 26What is the pneumonic for highlights of the program level?California mission
Feature creature
Abraham Lincoln – enabler's - 27How do you paint with the pallet?SELECTIVELY
It's a bad artist/Audrey who paints with ALL the colors.
You apply those rolls and artifacts SELECTIVELY - 28Which two types of paint do you have to choose to use on the pallet?Roles
Artifacts - 29What are the Numonics describing each item on the pallet? That the artist can selectively apply where needed?The met
Sharon from Israel
Coptic hat
Standing on milestone
Holding road map
Holding binoculars to enhance his vision and the other hand
Sister team
Jason with lean UX team - 30What's the primary measurement in safe?Measurement of working solutions
"Jack is WORKIN' man!"
With ultrasound solution all over his head - 31What are additional intermediate and long-term measures?Metrics that
TEAMS
PROGRAMS
PORTFOLIOS
...can use to MEASURE PROGRESS
This was also a missed opportunity by Pe - 32Why do the additional intermediate and long-term measures in safe make my heart feel hopeful?They could have helped P, and I can use them to help others
I know how now - 33What is my surprising insight around shared services?They are needed but cannot be dedicated full-time to a team
So not everyone is full time on the team is the insight - 34Define COPInformal group with mission of sharing practical knowledge
- 35What are types of milestones in safe?PI milestones
Fixed date milestones
Learning milestones - 36What do milestones track?Progress
towards a goal or event - 37What does the roadmap communicate?Planned DELIVERABLES
with their MILESTONES
over a TIMELINE.
Who's?
The art and value streams deliverables - 38Who's deliverables and milestones over a timeline does the roadmap communicate?Art
Value stream - 39CX
- 40What are the Numonics for the four rolls involved in art plus the fifth additional roll?Teeming prods
Wearing Engineer hats
(All aboard!...toot)
Under Arc de Triomphe
Business drones in suits walking around it - 41What are the Numonics for the 4+ rolls in the Art?Teeming
Prods
W Engineer hat
Under arc de Triomphe
Drone business people in suits as tourists to see the ark - 42What is a value stream?A construct
STEPS to provide a continuous flow of value - 43Value streams are the primary SAFe construct for what?Understanding
Organizing
Delivering
...value
All three - 44Each value stream is a long lived series of what?Steps
- 45What does the organization use those long lived steps for?To DELIVER a continuous flow of value!
See!
I KNOW this! - 46What is the primary role of a safe portfolio?Finance and nurture
… A set of solution development activities/
...aka A development Value stream! - 47What is a critical skill of the lean – Agile and Enterprise?Identifying AND optimizing value streams
("Solutions development activities") - 48In safe, you organize around what? Why? How?Value!
To keep a continuous flow of value getting delivered
Through the construct of the value stream
A long-lived series of steps - 49Why do you organize around value? Because it deliver substantial what?Benefits
- 50What are the key benefits that organizing around value brings?Faster learning
Shorter time to market
Higher-quality
Higher productivity
Better fit of solutions to purpose - 51What two steps does safe use to organize around value?1. UNDERSTAND the value stream
2. ORGANIZE ARTS to realize those value streams
These are good interview words for me to say - 52Value streams lend themselves to systematic what…? How?Analysis and improvement
via value stream mapping - 53Value stream mapping identifies and addresses what…?Delays
Waste
Non-value add activities - 54Safes foundation contains what five things?Supporting principles
Values
Mind set
Implementation guidance
Leadership roles
… Needed to deliver value at scale - 55What are the Numonics for the five elements contained in the safe foundation?… Standing on the concrete foundation of Dewey school:
School PRINCIPAL
VAL
big MIND
impish GUIDE DOG
named LEADER - 56The four core values define the WHAT for safe?The belief system
- 57What are the four core values of safe? That define it's belief system?Alignment
Transparency
Built-in quality
Program execution - 58What KIND of mindset are we talking about here?Lean – Agile mindset
- 59What are the Numonics for the for values of safe?Ally next-door
Transparent like ghost
Bilt-more Hotel behind
Getting EXECUTED
Like French revolution guillotine - 60The what, and what, are the basis for the Lean Agile mindset? Which is a NEW way of thinkingHouse of Lean
Agile Manifesto - 61The house of lean is a SAFE house. Enjoy this pictureEnter text here...

- 62How many safe principles are there? Hint: age of Artemis climbing over rocks9
- 63From what three areas do the six principles derive?Agile
Lean product development
Systems thinking - 64What does Val's implementation guide dog provide? That Leader is walking on top of?An implementation roadmap
The map on the Dewey playground - 65What does the safe foundation of "implementing guidelines" provide to make the challenging changes easier? Because implementing the changes necessary to become a Lean-Agile enterprise is a real change for most companiesAn implementation roadmap
The map on the playground at Dewey - 66Leadership Who has the ultimate responsibility for business outcomes?Managers
the formal ones in the organization - 67Why is it necessary for managers to be trained in, and become trainers of, Leaner ways of thinking and operating?Because they're the ones who have ultimate responsibility for business outcomes
- 68Why does safe describe a new style of leadership for the enterprise's leaders?Because it's this new lean style of leadership that enables leaders to get the benefits of safe
- 69What are the four core values of safe? That are key to its effectiveness?Alignment
Transparency
Built-in quality
Program execution - 70Core value one What does alignment look like in safe?One:
–Everyone in the portfolio,
– Every team member,
– On every ART…
Understands the strategy and the part they play in achieving it - 71Safe delivers alignment by orchestrating what four things?Strategic themes
Vision
Road map
PI planning - 72What are the Numonics for the four things safe uses to deliver alignment?… A line leading to…
A STRUT
Holding open a VAGina
over the Dewey ROADMAP
With a PIE at the end Ivan tries to eat - 73Why does safe care about built-in quality?Because the economic impact of poor quality is much greater in larger systems
Problems accumulate - 74What is the role of iNCREMENTS in built-in quality?Building in quality by INCREMENTS
ensures that each solution ELEMENT
will not be a waste point - 75How does safe provide transparency?By providing visibility into the work of the:
Portfolio
Value streams
Programs
Teams - 76What is the mechanism safe uses to PROVIDE that visibility into the: business value achieved and the retrospective of the PI?The
Inspect and Adapt event
(I & A) - 77What does the inspect and adapt event give visibility into? Hint: two thingsBusiness value achieved
Retrospective of the PI - 78Program execution The success of the value stream depends on the combined success of the what?The arts
- 79What does each art use to align teams to a common mission and vision?A single program backlog
- 80A feature is a service that does what?Meets a user need
- 81When does an architectural runway exist?When the enterprises platforms have sufficient existing technical infrastructure to support the implementation of the highest priority features in the near term program increment
Technical basis for developing business initiatives - 82The Agile release train is the primary construct to deliver what?Value
- 83Define the Agile release trainPrimary value delivery construct
- 84How does the art create alignment?Aligns teams to a common mission via:
Single vision
Road map
Program backlog
Information
- Description
- SAFe 4.0 Certification Flashcards on SAFe 4.0, created by Kelly Fidei on 21/04/2017.
- Created by
- Kelly Fidei
- Views
- 11
- Rating