Flowchart
Flow Chart Operation management
Flowchart content
It is download
The raw material is recieved. Can be either chipa or steel
It is classified according to the diameter
If is Steel or barra recta
If is chipa
The Raw material is introduced in 'Los trenes de figuración)
The raw material is introduced in the robots
From a figuration bill that show the order and specification of the client starts the production
Start to work either 'tren de figuración manual' or robots depending the order
Final Product
Information
- Description
- Flowchart on Flow Chart Operation management, created by Juan Diego Franco on 08/11/2017.
- Created by
- Juan Diego Franco
- Views
- 1
- Rating