  1. 1.0 Develop and Document Prototype Structure

  2. 1.1 Develop Individual Concept Reports

  3. 1.1.1 Assign team member roles and organize development process through a gantt chart

  4. 1.1.2 Form team meeting times and data exchange methods

  5. 1.1.3 Breakdown components of each subsystem and effectively assign components to each team member

  6. 1.1.4 Collaborative activities are completed together and as soon as possible to distribute workload and reduce stress

  7. 1.1.5 Components are examined and discussed to regulate the trajectory of a cohesive final design

  8. 1.2 Complete collaborative documentation and presentations

  9. 1.2.1 Distribute workload of collaborative activities with respective strengths and weaknesses of each member

  10. 1.2.2 Form shared documents with team members providing constructive criticism to each others work

  11. 1.2.3 Develop a script and animations that improve the effect of the presentation

  12. 1.2.4 Complete vital calculations of a finalized prototype system

  13. 1.2.5 Finalize the collaborative documentations by a deadline

  14. 1.3 Construct the prototype

  15. 1.3.1 Assign subsystem tasks to team members to distribute workload

  16. 1.3.2 Construct subsystems in order of flexibility to modify the subsequent

  17. 1.3.3 Put together each subsystem as a team and make refining changes

  18. 1.3.4 Test the prototype and monitor the designs performance

  19. 1.3.5 Refine or modify the design based on testing results and repeat the process until an agreeable solution is developed

Information

Description
Flowchart on Untitled, created by Dominic Shevchuk on 24/03/2024.
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?