GoConqr has a new look! Let us know what you think.

Mind map

Risk evaluation

Mari Gunnerud English

Mind map on risk evaluation: policy level, portfolio level and compensations according to contract type

Mind map: risk evaluation

Map content

Risk evaluation

  1. On policy level:

    • n incidents during a certain time period
      • Total loss z = x_1+...+x_n,
        • where x_i denotes the loss of the i-th incident
  2. On portfolio level:

    • N different claim sizes during a certain time period
      • Total portfolio loss Z = X_1+...+X_N,
        • where X_i denotes the total loss of the i-th type of claim
  3. Compensations will differ according to the type of contract:

    • z = actual total replacement value, f(x)= actual compensation of the each loss:
      • z = f(x_1)+...+f(x_n)
      • Given the i-th loss x_i, the contract f(x_i) determines the i-th compensation.
        • Can now include the possibility of e.g. only covering losses x_i within a certain range, say [y,y+b], for y,b > 0:
          • f(x_i) = 0 if x_i < y
            • f(x_i) = x_i - y, if y < x_i < y+b
              • f(x_i) = b, if x_i > y+b
                • where y denotes a certain deductible
                  • (Reinsurance can be arranged in a similar way)
    • The insurance company is not necessarily obliged to cover the whole loss of the policy holder!

Information

Description
Mind Map on Risk evaluation, created by Mari Gunnerud on 11/10/2014.
Created by
Mari Gunnerud
Views
658
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?