Mind map
Issues in project evaluation and maintenance: Transformational capacity
Map content
Issues in project evaluation and maintenance: Transformational capacity
In addition to evaluating how successfully primary innovations have been implemented to date, I evaluate the extent to which secondary innovations have been successfully institutionalized.
- the project (developing new matenals) delayed the implementation of subsequent phases. Furthermore, although I have gathered a considerable amount of longitudinal data for evaluation purposes, there are still important gaps in
- Revising units is also an important acnvity in the CATI project. As noted earlier, revising materials is less glamorous than production
- Teaching assistants during this early period had little personal stake in using the materials that they and their colleagues had developed.
- materials from a teacher development perspecuve emerge from an evolutionary, classroom-based approach to syllabus design and methodology (Baumgardner et al. 1986). Extract 6.1 displays the original version of section 1 of the Iceman unit i
- Although both versions of section 1 begin with a brainstorming activity, the focus of these activities is quite different. In version 1, the subject matter of activity A is directly linked to the thematic content of the unit. However, the subject matter of activity A not only leads to a thematically related discussion of the Iceman story but 1s also base
- The development of new methodological skills is not only more difficult to observe empirically, but it is more difficult to describe this dimension of change in a way that allows participants to do something useful with these descriptions.
- Although both versions of section 1 begin with a brainstorming activity, the focus of these activities is quite different. In version 1, the subject matter of activity A is directly linked to the thematic content of the unit. However, the subject matter of activity A not only leads to a thematically related discussion of the Iceman story but 1s also base
- materials from a teacher development perspecuve emerge from an evolutionary, classroom-based approach to syllabus design and methodology (Baumgardner et al. 1986). Extract 6.1 displays the original version of section 1 of the Iceman unit i
- Teaching assistants during this early period had little personal stake in using the materials that they and their colleagues had developed.
- Revising units is also an important acnvity in the CATI project. As noted earlier, revising materials is less glamorous than production
- the project (developing new matenals) delayed the implementation of subsequent phases. Furthermore, although I have gathered a considerable amount of longitudinal data for evaluation purposes, there are still important gaps in
Information
- Description
- Mind Map on Issues in project evaluation and maintenance: Transformational capacity, created by HENDERY N on 26/06/2022.
- Created by
- HENDERY N · Jun 2022
- Updated
- May 4, 2023
- Views
- 0
- Rating