Mind map
The Lean Six Sigma System

Map content
The Lean Six Sigma System
Main Goal
- Maximize shareholder value
- How
- Achieving the fastest rate of improvement in
- Customer Satisfaction, Cost, Quality, Process Speed, Invested Capital
- Achieving the fastest rate of improvement in
- How
- Maximize shareholder value
Lean Six Sigma
- Lean manufacturing tools increase process speed and reduce process waste. Six Sigma quality tools to reduce process variation and eliminate product defects
Six Sigma: The Power of a Quality Culture
- Goal
- Create a quality management system to measure process capability and to improve it to near-perfection
- The Quality Culture
- Customer centric, finanalcial results, management engagement, resource commitment (1-3% staff), excecution infrestructure
- Metrics
- Potential Process Capability Index (Cp)
- Process variation vs. Quality specifications, it must be larger than 1.33
- Real Process Capability Index (Cpk)
- Process distribution vs. Quality specifications, it must be larger than 1.00
- Potential Process Capability Index (Cp)
- Metrics
- Customer centric, finanalcial results, management engagement, resource commitment (1-3% staff), excecution infrestructure
- Goal
Process and Improvement Tools
- Step 1: DEFINE
- Step 2: MEASURE
- Step 3: ANALYZE
- Step 4: IMPROVE
- Step 5: CONTROL
- Develop control plan, monitor performance, and mistake-proof process
- TOOLS
- Control plan, statistical process control, Poka-Yoke devices, and process documentation
- TOOLS
- Develop control plan, monitor performance, and mistake-proof process
- Generate ideas for product and process design, conduct experiments, create straw models (prototypes), develop implementation plans, and validate improvements
- TOOLS
- Design of experiments, total productive maintenance, SMED, flow manufacturing, and jidoka / autonomation
- TOOLS
- Step 5: CONTROL
- Determine process capability and speed, and determine dources of variation and cycle time bottlenecks
- TOOLS
- Statistical process control, process mapping / arrow diagram, standard operations analysis, and DFMEA /PFMEA
- TOOLS
- Step 4: IMPROVE
- Define current state, confirm project objectives, and collect and display data
- TOOLS
- Lean Six Sigma diagnostic, process mapping, statistical process control (7H / 7M), and MSA
- TOOLS
- Step 3: ANALYZE
- Identify black belt and team resources, prepare team charter, and obtain project approval
- TOOLS
- Project management, VA / VE, and financial analysis
- TOOLS
- Step 2: MEASURE
- Step 1: DEFINE
The Speed of Lean Manufacturing
- Goal
- Identify the “time traps” injected by fewer than 20% of the workstations that cause 80% of the delays and eliminate them
- Metrics
- Process Cycle Efficiency > 25%
- Value-Added Time, and Total Lead Time
- Sources of Waste Reduction
- Shorter lead time, less inventories, less material handling, fewer customer complaints, and less scrap and rework
- Process Cycle Efficiency > 25%
- Metrics
- Identify the “time traps” injected by fewer than 20% of the workstations that cause 80% of the delays and eliminate them
- Goal
Images and files in the map
Information
- Description
- Este cuadro habla sobre el lean six sigma
- Created by
- edu709
- Views
- 125
- Tags
- Rating