SAB9#47_Controlling_Scope
I have to do if there is a change in project scope ?
variance analysis.
- This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
The goal of Control Scope is updating the scope, plan, baseline, and WBS info
This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project