Mind map
Soft Engineering - River Quaggy Restoration Scheme

Mind map: River Quaggy restoration scheme
Map content
Soft Engineering - River Quaggy Restoration Scheme
Project
- River runs through London since 1960's
- Had been heavily managed with artificial channels and culverts to divert river beneath Greenwich
- Increased flood risk from increased urbanisation in Lewisham and Greenwich mean more needed to be done in order to protect these areas
- Hard engineering methods where considered but EA chose a more sustainable approach
- Solution was proposed by QWAG - Quaggy Waterways Action Group
- Planned to bring river above grounds again, cutting a new channel thought Sutcliffe park creating a multi-functional space, improving the quality of the park
- Park was lowered to increase the flood capacity
- river is redirected a more natural course with flood storage
Impacts
- Created a wetland environment with reed banks, wild flower meadows and trees.
- Creation of new habitats
- Enter text here
- Scheme won Natural Environment Category in the 2007 water ways renaissance awards
- smaller opportunity cost
Effectiveness
- Long term sustainable scheme
- Relatively low cost in comparison to other hard engineering schemes
- little maintenance costs
- Areas has not experienced any major flood event since the project was completed
- Reduced risk for 600 homes and businesses
Information
- Description
- Mind Map on Soft Engineering - River Quaggy Restoration Scheme, created by jenny_mcdonald on 11/05/2014.
- Created by
- jenny_mcdonald
- Views
- 2,784
- Rating