Work Breakdown Structure
Outputs
- Proyect document (updates)
- Requirements documentation
- Scope baseline
- Basis for many other processes like budget, risk, activities definition, procurement
- Monitored, verified, and controlled throughout the project
- WBS dictionary
- WBS
- Approved detailed scope statement
- Product scope description
- Project deliverables
- Product user acceptance criteria
- WBS Dictionary
- Supporting Document for WBS
- Has detailed description of the compnents in the WBS
- Code of account identifier
- Description of work
- Responsible organization
- List of schedule milestones
- Associated schedule activities
- Resources required
- Cost estimates
- Quality requirements
- Acceptance criteria
- Technical references
- Contract information
- WBS
- Deliverable-oriented hierarchical descomposition od the work
- Each descending level represents an increasingly detailed definition of the project work
- Tied up with
- Control Account
- Management control point where scope, cost and schedule are integrated and compared
- May include one or more work packages
- Control Account
- Work packages
- Planned work contained within the lowest level WBS components
- Can be scheduled, cost estimated, monitored and controlled
- WBS level at which the cost and activity durations for the work can be reliably, estimated and managed
- Must be associated with only one control account
- Executed by the project team
- To acomplish the project objectives and create the required deliverables
- Deliverable-oriented hierarchical descomposition od the work
- Proyect document (updates)
Inputs
- Project scope statement
- Requirements documentation
- Organizational process assets
Definition
- Process of subdividing project delivverable and proyect work into smaller, more manageable components
Scope
- Tools and techniques
- Descomposition
- Subdivision of project deliverables into smoller, more manageable components until the work and deliverables are defined to the work package level
- Descomposition
- Tools and techniques
Information
- Description
- Mind Map on Work Breakdown Structure, created by Liam Jaden on 13/09/2017.
- Created by
- Liam Jaden
- Views
- 0
- Rating