OPERATIONAL RISK
Map content
OPERATIONAL RISK
PROCUREMENT
- CLAIM SETTLEMENT
- CONTRACTOR INSOLVENCY
- INADEQUATE LEAD TIME
- INADEQUATE SUPPLY SOURCES
- INCOMPLETE QUANTITY ESTIMATE
- DIFFICULT TO OBTAIN PERMIT
- INCORRECT INFORMATION FROM INVESTOR
- OVER-OPTIMISTIC WORKERS
- SCHEDULE OVERRUNS
- BUDGET EXCEEDS
- UNDOCUMENTED CHANGE ORDERS
- ACCEPTANCE TOWARDS UNREALISTIC DATELINE
- LACK SUCCESSION PLANNING
- DEFECTIVE DESGN
- REMUNERATION (LATE SALARY)
LOGISTICS
- TRAFFIC CONGESTION
- OVERLOADING
- ROAD ACCIDENTS
- MATERIAL DELIVERY DELAY
- PROJECT DELAY
- WEATHER CONDITION
- ACCIDENT DURING LOADING/UNLOADING
- ACCIDENTS ON WORKERS
- ROAD CONDITION (SLIPPERY)
- LORRY/TRUCK BREAKDOWN
- CRANE/FORKLIFT BREAKDOWN
- PRIME MOVER TYRE EXPLODE
- STRUCK BY EQUIPMENT/MACHINE
HUMAN RESOURCES
- HIGH ABSENTEEISM
- HUMAN ERROR
- SHORTAGE SKILLS
- POOR ETHICS
- WORKERS STRIKE
- SABOTAGE
- SHORTAGE LABOR
- WORKERS NOT ABIDE REGULAR WORK HOURS
- CORRUPTION IN WORKERS
- FRAUD
- WORKERS INJURED DURING WORKING HOURS
- POOR LEADERSHIP
- WORKERS TURNOVER
- CONFLICT AMONG WORKERS
- CUSTOMER COMPLAIN
RESOURCES
- MACHINERY NOT AVAILABLE
- WASTE OF RESOURCES
- WEAR/TEAR MACHINE
- EQUIPMENT NOT PROPERLY HANDLE
- MATERIAL SHORTAGE
- SKILL GAPS BETWEEN WORKERS
- NON-QUALITY MATERIAL
- MATERIAL/LABOR AVAILABILITY
- LOW OPERATING PRODUCTIVITY
- WRONG MATERIAL ORDER
- DEFECT MATERIAL/EQUIPMENTS
- INCOMPLETE DESIGN DOCUMENTS
- NATURAL DISASTER
- UNABLE ADAPT WITH NEW TECHNOLOGY
- INTERRUPTING DURING LOADING/UNLOADING
CONSTRUCTION