CHAPTER 5 : Part 1

Firdaus Salleh English

Map content

CHAPTER 5 : Part 1

  1. Types of project constraints

    • Technical or Logic Constraints
      • related to the networked sequence in which project activities must occur
    • Resource Constraints
      • absence, shortage, or unique interrelationship and interaction characteristics of resources that require a particular sequencing of project activities
      • People, Materials, Equipment, Working Capital
  2. Scheduling Problem

    • Time Constrained Project
    • Resource Constrained Project
  3. Resource allocation Methods

    • Limiting Assumptions
      • Splitting activities is not allowed
      • Level of resource cannot be changed
      • most slack pose the least risk.
      • Reduction of flexibility does not increase risk.
    • Time-Constrained Projects
      • completed by an imposed date
      • leveling techniques
        • Peak resource demands are reduced
        • Resources over the life of the project are reduced.
        • Fluctuation in resource demand is minimized.
    • Disadvantages
      • Loss of flexibility occurs from reducing slack
      • Increase in criticality of all activities
  4. Splitting Activities

    • Scheduling technique to get a better project schedule or to increase resource utilization
  5. Benefits of Scheduling Resources

    • Leaves time for consideration of reasonable alternatives :
      • Cost-time tradeoffs Changes in priorities
    • Provides information for timephased work package budgets to assess:
      • Impact of unforeseen events.
      • Amount of flexibility in available resources
  6. Multi-project Resource Schedule

    • Problem
      • Overall project Slippage
      • Inefficient resource application
      • Resource bottlenecks
    • Solution
      • Create Project Offices or departments
      • Use a project priority queuing system
      • Centralized project management
      • Outsource
  7. Rationale for Reducing Project Duration

    • Time to Market
    • Adaptability
    • Unforeseen Delays
    • Incentive Contracts
    • Imposed Deadlines
  8. Accelarating Project Completion

    • Resource Constraints
      • Do it twice – fast and correctly
      • Fast-tracking
      • Critical chain
      • Reducing Project Scope
      • Compromise Quality
    • Resource Not Constraints
      • Adding resources
      • Outsourcing Project Work
      • Scheduling Overtime (OT)
        • Advantages
          • Avoid additional cost
          • Fewer distraction
        • Disadvantages
          • 2x / 3x payment
          • productivity decline
      • Establish a Core Project Team
  9. Cost

    • Direct Cost
      • Normal costs that can be assigned directly to a specific work package/project activity
      • Labor, materials, equipments, and subcontractors
      • Crashing will increase direct costs
    • Indirect Cost
      • Cannot be associated with any particular work package
      • Supervision, admin, consultant, machinery
      • (crashing) will reduce indirect costs.
  10. Priority Rules

    • ASAP
    • Minimum Slack First
    • ALAP
    • Shortest task duration first
    • Most Successor
    • Most critical followers
    • Most Resource first

Information

Description
Mind Map on CHAPTER 5 : Part 1, created by Firdaus Salleh on 08/01/2018.