Software Development!

Description

Mind Map on Software Development!, created by KierenV69 on 01/12/2014.
KierenV69
Mind Map by KierenV69, updated more than 1 year ago
KierenV69
Created by KierenV69 over 10 years ago
22
1
1 2 3 4 5 (0)

Resource summary

Software Development!
  1. TELOS
    1. Technical
      1. Technical Feasibility:
        1. Does the technology exist to do what we want to do?
      2. Economical
        1. Economical Feasibility:
          1. Will it make sense from a financial point of view to develop this software? For example, if it costs more than we'll save over the next 7 years it might not be worth doing.
        2. Legal
          1. Legal Feasibility:
            1. Are there any copyright issues that might stop us going ahead? For example, infringing the patents of another company to bring out a competing profdcut may result in that product having to be withdrawn or compensation being paid.
          2. Operational
            1. Operational Feasibility
              1. Will the users be able to operate it? Will it be practical to use or will people just not bother?
            2. Schedule
              1. Schedule Feasibility
                1. Is it possible to develop this software in the necessary timescale? When does ithe company need it by? A phone app for the 2012 Olympics needed to be ready before it started!
            3. The Waterfall Model
              1. Feasibility Study
                1. Analyse
                  1. Design
                    1. Implement
                      1. Evaluate
                        1. Maintain
                          1. Advantages
                            1. Steps are easy to maintain
                              1. Defined processes and output per step
                                1. Good model for managing large groups of developers working in parallel
                                2. Disadvantages
                                  1. Requirement changes mean going back to an earlier stage that had already been completed
                                    1. Changes can be costly in money and time
                                      1. Lack of customer involvement after "ANALYSIS" means issues are not highlighted until the "EVALUATION".
                                    2. The Cyclical Model
                                      Show full summary Hide full summary

                                      1 comment

                                      over 10 years ago
                                      Great guide to software development

                                      Similar

                                      ICT Revision 2014
                                      11RaceyG
                                      An Inspector Calls - Quiz
                                      Emily Morrison
                                      Nervous System
                                      4everlakena
                                      Checking out me History by John Agard
                                      Eleanor Simmonds
                                      Test for positive ions
                                      bella.mort
                                      Project Scope Management Process
                                      neeshar
                                      GCSE REVISION TIMETABLE
                                      neharaniga
                                      GCSE REVISION TIMETABLE
                                      megangeorgia03
                                      Photosynthesis and Respiration
                                      Jessica Phillips
                                      Pega CSSA 7.2 Dumps
                                      Kavya Virupaksha