Chapter 5: Project Selection

  1. process done to select the most beneficial project to the organization

    • stategic values of the company have to align to the projects
    • Project can be ranked in line with their contribution to the succes of the organisation
    • information needed
      • Production considerations
      • Marketing Considerations
      • Financial Consideration
      • Personnel Considerations
      • Administration and other considerations
  2. Numeric models

    • Payback perios
    • Return on Investment
    • Net Present Value
    • Internal Rate of return
    • give managers an approach to the possible profitability of the project
  3. Payback Period

    • Is the time taken to gain a financial return equal to the original investment. Expressed in months and years
    • Advantages
      • Simply and easy to use / uses available info / reduces risk and uncertainty / reduced future cash flow uncertainty / appropriate for a rapidly changing environment
    • Disadvantages
      • not considers the time value of money / not suitable for long term projects / based only on cash flows / does not quantify risk / doesn't look at the total project
  4. Return on Investment

    • calculates the average annual profit.
      • The profit is then converted into a percentage ofthe total outlay
    • Advantage
      • being a simple technique like the paybackperiod, but further, it considers the cash-flow over the whole project
    • Disadvantage
      • it averages out the profit over successive years. An investment with high initial profits would be ranked equally with a project with high profits later ifthe average profit was the same.
  5. Discounted Cash Flow

    • It takes into consideration the time value of money, for example, $100 today will not have the same worth or buying power as a $100 this time next year.
    • There are two basic DCF techniques that can model this effect, net present value (NPV) and internal rate of return (IRR).
    • Main Problem
      • besides being dependent on the accurate forecast of the cash-flows, it also requires an accurate prediction of the interest rates
  6. Net Present Value

    • is a measure of the value or worth added to the company by carrying out the project
    • preference should be given to the project with the highest NPV
    • Advantages
      • introduces the time value of money. / expresses all future cash-flows in today's values / allows for inflation and escalation. / looks at the whole project from start to finish. / simulates project what-if analysis / It gives a more accurate profit and loss forecast than non-DCF calculations.
    • Disadvantages
      • limited by the accuracy of the predicted future cash-flows and interest rates / biased towards short-run projects / excludes non-financial data / uses a fixed interest rate over the duration of the project.
  7. Internal Rate of Return

    • also called DCF yield or DCF return on investment. The IRR is the value ofthe discount factor when the NPV is zero.
    • Calculated
      • NVR against IRR
    • Select the one with the highest IRR
  8. Net Present Valur Using variable Interest Rates

    • In this method interest rates fluctuate aiming to give a better and more precise
  9. Scoring Models

    • Factor Model
      • lists a number of desirable factors on a project selection proforma along with columns for Selected and Not Selected.
      • not strictly numerical, speaking about money
      • Helps to prioritize and eliminate project goals
  10. Cost Break-Even Analysis

    • Separates the costs -> fixed from variable.
    • Evaluate the costs and determine a break-even point with sales.
    • allows the project manager to see at a glance how profit varies with change in volume
    • can also be used to aid decision-making where two mutually exclusive projects present a different cost structure
  11. Project Life-Cycle Cash-Flow

    • plots in a graph the cash-flow and break-even point against the project (or product) life-cycle
    • cash-flow will be increasingly negative until the product goes into service and a return is achieved on your investment
    • Helps to visually aid how the financial evolution of the project will take place

Information

Description
Mind Map on Chapter 5: Project Selection, created by Mariana Alejandra Ruano Rochin on 10/06/2019.
Views
0
Rating

More on Project Selection and Initiation

Feedback

What is it about?

What do you think of the new look?

How do you like it?