GoConqr has a new look! Let us know what you think.

Mind map

Modeling Detailed Operations

Juan Andrés Radi Spanish

Map content

Modeling Detailed Operations

  1. Modeling Approach

    • Combine the modeling constructs
      • Basic Process
        • System quickly and easily
      • Advanced Process
        • More detailed modeling capabilities
        • Additional modeling capabilities
      • Advanced Transfer
        • Material-Handling activities
        • Entity movement
      • Block
        • Lower level of modeling capability
        • Special-purpose modeling constructs
      • Elements
        • Experiment frame modules
  2. New Modeling Issues

    • Rejections and Balking
      • Employ a Queue module from the Blocks Panel
        • Decide
          • Available, proceed and seize.
          • Not available, the entity is send to the balking section
        • Sieze
          • Available it continue to the system
          • Not available stay in the in the queue or leave the system
    • Three-way Decisions
      • Type of process
      • Parts based on probability
      • Re-compute the probabilities
      • Directions in the same decide module
    • Variables and Expressions
      • Variable
        • Module
          • Global variable
          • Initial values
        • Referenced
          • Name
          • Dimensional arrays
        • Can be reassigned during the simulation run.
      • Expression
        • Module
          • Define expressions
          • Associated values
        • Referenced
          • Names
          • Dimensional arrays
        • Evaluated and its numerical value is returned
    • Storage
      • Animate the presence of entities
      • Holds a non-ordered set of entities
      • Place an entity and then remove it.
        • Store an Unstore modules
        • Module that has a field to enter a Storage ID
      • Entity would be displayed on the animated Storage.
    • Terminating or Steady State
      • Terminating
        • Specific Starting conditions.
        • Stopping conditions.
      • Steady state
  3. Building the model

    • Arrival Cutoff logic
    • System Exit and Run Setup
      • Record module, increment Completed Calls counter
      • Assign module, decrement Total WIP variable
    • Animation
      • Storage
        • Recording
        • Graphic
      • Plots
      • Queue
    • Technical Support call
      • Unstore for recording, product type selection
      • Decide module for product type
      • Process modules for tech-support service
        • Seize-Delay-Release
        • Tech Time
        • Seize, multi-unit Resource
    • Order-Status Calls
      • Delay block
      • Decide module
        • No sales person required
        • Sales person required
    • Sales Calls
      • Change Entity Type, Picture
      • Priority over order-status
    • Create Arrivals and direct to service
      • Arrivals with variable MaxCalls
      • Decide
        • MR
        • NR
      • Conditions
  4. Inventar Simulation

    • System Description
      • Average ordering cost per day
      • Average holding cost per day
      • Average shortage cost per day
    • Simulation Model
  5. Enhanced Call Center

    • Changes
      • Nonstationary Poisson process
      • function
    • Data Structure
      • Schedules
      • collect same-type items together
    • Modifying the Model
      • Tech Call Type
      • Back office
      • Statistic data

Information

Description
Mind Map on Modeling Detailed Operations, created by Juan Andrés Radi on 18/06/2015.
Created by
Juan Andrés Radi · Jun 2015
Updated
Feb 19, 2016
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?