GoConqr has a new look! Let us know what you think.

Mind map

Cost Accounting

Maria Andrea Gastelum Vidal Spanish

Map content

Cost Accounting

  1. Concerned with determining cost structure and the best costing system for each organizartion based on product/service nature, manufacturing environment and resources

  2. Three cost elements:

    • Direct Materials: All the parts or ingredients used to make a product. They are measured and traced to production
    • Direct Labor: The amount of work, measured in hours that is traceable to production. It involves labor that are physically in charge of making tha product.
      • Prime Cost: DM+DL
    • MOH: Indirect materials and supplies, indirect labor, rent, insurance, depreciation on assets, and propoerty tax.
      • Conversion Cost: DL+MOH
  3. PRODUCTION FLOW CHART

    • DMBI +net purchase =DM Available -DMEI =DMU +DL +MOH =Prod. Cost f/Period +WIP BI =Total Cost in Process -WIP EI =COFG +FG BI =FG Avail. f/sale -FG EI =COGS
      • Income Statement: Sales -COGS =Gross Profit -Operating Ex. =Operating Prof. +/-Other income Expenses =Net income before tax -Tax =Net Income
  4. NORMAL COSTING

    • POHR
      • Total estimated MOH/Estimated allocation base
        • Allocation base: It is a unit of measurement that measures and triggers MOH consumption and production efficiency.
      • MOA = POHR x Actual Base
        • MOA>AMO: overapplied MOA<AMO: underapplied
    • 1. Distribute the under-overapplied overhead among WIP, FG and COGS ending balances.
      • 2. Send directly the under-overapplied overhead to COGS.
    • ABC Costing
      • It assings MOH costs to products in a more logical manner than the traditional approach of simply allocating costs on the basis of machine hours.
      • First Step: Get the POHR for each activity.
        • Second Step: Multiply the POHR of each activity times the Estimated Driver.
  5. JOB COSTING

    • Used for production of large, unique, high-cost items. Built to order rather than mass produced.
      • 1. Identify all orders
        • 2. Identify BB. Sum of DM, DL, and MOH.
          • 3. Assign DMU, DL, and MOA
            • WIP EI: Unfinished
            • FG EI: Finished, not sold
            • COGS: Finished and sold
            • COFG: Finished, whether sold or not.
  6. PROCESS COSTING

    • It is used when there is mass production of similar products, where the costs associated with individual units of output cannot be differentiated from each other.
    • I. Physical Units: Beginning Inventory +Units Started =Units in Process -Ending Inventory =Units Finished and T-Out
      • II. Equivalent Units (for DM and CoCo): Units F & T-Out +Eqivalent End. Inv. =Eq. Units in Process -Eq. Ending Inv. =Equivalent Production.
        • III. Total Cost (for DM and Coco): Beginning Inventory +Period
          • IV. Unit Cost: DM per unit; CoCo per unit
            • V. Cost Assigned: a) Eq. Ending Inventory for DM and CoCo b) Units Finished
              • a) Eq. End. Inv x $ per unit b) Units Fin. x Total DM in Total Cost
            • Weighted Average: Total DM in Unit Cost/DM Equivalent Units in Process FIFO: Total DM Period in Total Cost/Equivalent Production
        • Eq. Ending Inv. DM x % given in Physical Units, same for CoCo
  7. STANDARD COSTING

    • It is a spinoff of DM, DL and MOA accumulation. It is based on engineering and technical/financial rates for variance and fixed costs elements. Standard=goal
    • Variance: difference between real and standard cost.
      • Var DM$ =(stdr DM$ vs. actual DM$) DM purchases per unit Var DMQ=(stdr Q "allowed" vs. Acutal DM used) Stdr DM $
    • Formulas
      • DM $(rate) var= (stdr DM$ vs Actual DM$) DM Purchases DM Q(hours) var= (stdr DM allowed vs actual DM used) Stdr DM$
      • DL $ var= (stdr DL$ vs actual DL$) Actual hours DL Q var= (DL hrs allowed vs. actual hrs) Stdr DL$
      • VOH $ var= (stdr VOH$ vs actual VOH$) actual hrs VOH Q var= (DL hrs allowed vs actual hours) Stdr VOH$
      • FOH spending variance= (actual FOH total vs. budgeted FOH total) FOH volume variance= (budgeted FOH total vs. Standard FOH total)

Information

Description
Mind Map on Cost Accounting, created by Maria Andrea Gastelum Vidal on 29/11/2015.
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?