GoConqr has a new look! Let us know what you think.

Quiz

MEP

Lonnie Ingram 19 questions

Take the quiz

Questions in this quiz (19)

  1. 1Heating and cooling equipment located in a garage must be protected from impact. This is generally done by placing what in front of the equipment?
    1. AMesh wire
    2. BWood fencing
    3. CPlastic pipe
    4. DSteel pipe
  2. 2The minimum size door required to access HVAC equipment is:
    1. A20"
    2. B24"
    3. C30"
    4. D40"
  3. 3Suspended HVAC equipment must be at least _ from the ground.
    1. A6"
    2. B8"
    3. C12"
    4. D16"
  4. 4Factory-made ducts must be approved and labeled by:
    1. AIRC
    2. BRAC
    3. CLU
    4. DUL
  5. 5When ducts must run between floors, they need to be run in a(n)
    1. Ainsulated space
    2. Bopen space
    3. Cconcealed space
    4. Dunder ground
  6. 6If a residential or commercial structure cannot be uniformly heated or cooled from one compressor a _______ system may be required.
    1. Asplit
    2. Bdouble
    3. Cseries
    4. Dparallel
  7. 7One type of zonal heater is:
    1. Abaseboard
    2. Bradiator
    3. Cblower
    4. Dnone of the above
  8. 8In a central heating system, the thermostat should be placed:
    1. Aby a door
    2. Bnext to a window
    3. Cin the kitchen
    4. Dclose to return air duct
  9. 9A fitting with a removal plug is a :
    1. Acleanout
    2. Bdrain
    3. Cfitting
    4. Dmain
  10. 10A pipe, normally underground, that carries wastewater and refuse is called a :
    1. Asoil pipe
    2. Btrap
    3. Cstack
    4. Dsewer

Information

Description
Drafting MEP test
Language
English
Views
150
Rating
No ratings yet
Rate this quiz
Rate this quiz

Feedback

What is it about?

What do you think of the new look?

How do you like it?