- 11) when consultants are used for a project, AIA Doc (__) is used: 2) this doc states the consultant is an: 3) it states for their portion of the project they must perform services w/: 4) it states all communication btwn consultant & owner, contractor, or oth consultants must go thru:1) C401 Standard Form of Agrmt Btwn Arch & Consultant
2) independent contractor
3) the same standard of care as oth profs. practicing in the same or sim locality under the same or sim. circum.
4) the architect - 21) C401 also states the consultant is not responsible for:1) the acts or omissions of the arch, the archs oth consultants, contractors, subcontractors, agents or employees, or oths performing any of the work
- 3CONSULTANT RESPONSIBILITIES 1) recommend to the arch the appropriate: 2) coord. their services w/ the: 3) prov. (__) to the arch & oth consultants as needed 4) prov. a (__) for the consultants work for the archs approval1) surveys, tests, analyses, reports, & services of oth consultants needed
2) arch & oth consultants
3) copies of dwgs, reports, specs & oth necessary info
4) schedule - 4CONSULTANT RESPONSIBILITIES 6) assist the arch in determining whether or not the arch will:6) reject work for the consultants portion of the project or whether additional inspection or testing is reqd
- 5ARCHITECT RESPONSIBILITIES 1) the arch is reqd to prov. in a timely manner all of the: 2) ^ this includes:1) relevant project info that pertains to the design & coord. of the consultants portion of the work
2) detailed layouts showing location of connections, tabulations giving size, loads, oth info on equip designed, specified, or supplied by oths - 61) example - the arch must provide the elec consultant w/ an itemized list of: 2) the arch is entitled to rely on the accuracy & completeness of: 3) the arch must inform consultants about:1) equip., model numbers, detailed elec reqs of any equip determined in the programming phase of the project
2) services & info prov. by consultant
3) code reqs that apply to their portion of work & design decisions that may have code implications - 71) although arch is responsible for ensuring the dwgs & specs conform to applicable codes, ea. consultant is responsible for code compliance in: 2) by signing their dwgs, engineering consultants become responsible for: 3) as the arch is the primary consultant they are liable to:1) their area of work (sim. to how arch is responsible to owner under the B101)
2) compliance w/ applicable codes & regs, accurate production of their dwgs & specs, checking their docs for consistency
3) the owner for the consultants work
Information
- Description
- PPM ARE 5.0 PPM (Project Planning & Mgmt) Ballast Review Flashcards on Contracts - Arch-Consultant Agrmt AIA Doc C401, created by Kara Biczykowski on 01/10/2021.
- Created by
- Kara Biczykowski · Oct 2021
- Updated
- Oct 1, 2021
- Views
- 52
- Tags
- Rating