08 PROJECT QUALITY MANAGEMENT

miguelabascal PMP - All Chapters PMP Inglés 16 fichas

Fichas del conjunto (16)

  1. 18.1 Plan Quality ManagementThe process of identifying quality requirements and/or standards for the
    project and its deliverables and documenting how the project will demonstrate compliance with quality
    requirements.
  2. 28.2 Perform Quality AssuranceThe process of auditing the quality requirements and the results from
    quality control measurements to ensure that appropriate quality standards and operational definitions
    are used.
  3. 38.3 Control QualityThe process of monitoring and recording results of executing the quality activities
    to assess performance and recommend necessary changes.
  4. 4Quality as a delivered performance or result isis “the degree to which
    a set of inherent characteristics fulfill requirements” (ISO 9000)
  5. 5Grade asa design intent is a category assigned
    to deliverables having the same functional use but different technical characteristics
  6. 6Precision is aFor example, the magnitude for each increment
    on the measurement’s number line is the interval that determines the measurement’s precision—the greater the
    number of increments, the greater the precision.
  7. 7Accuracy is anAccuracy is an assessment of correctness. For example, if the
    measured value of an item is very close to the true value of the characteristic being measured, the measurement
    is more accurate.
  8. 8• Customer satisfactionUnderstanding, evaluating, defining, and managing requirements so that
    customer expectations are met. This requires a combination of conformance to requirements (to ensure
    the project produces what it was created to produce) and fitness for use (the product or service needs to
    satisfy the real needs).
  9. 9• Prevention over inspectionQuality should be planned, designed, and built into—not inspected into the
    project’s management or the project’s deliverables. The cost of preventing mistakes is generally much
    less than the cost of correcting mistakes when they are found by inspection or during usage.
  10. 10• Continuous improvementThe PDCA (plan-do-check-act) cycle is the basis for quality improvement as
    defined by Shewhart and modified by Deming. In addition, quality improvement initiatives such as Total
    Quality Management (TQM), Six Sigma, and Lean Six Sigma could improve the quality of the project’s
    management as well as the quality of the project’s product. Commonly used process improvement models
    include Malcolm Baldrige, Organizational Project Management Maturity Model (OPM3®), and Capability
    Maturity Model Integrated (CMMI®).
  11. 11Management ResponsibilitySuccess requires the participation of all members of the project team.
    Nevertheless, management retains, within its responsibility for quality, a related responsibility to provide
    suitable resources at adequate capacities.
  12. 12Cost of quality (COQ).Cost of quality refers to the total cost of the conformance work and the
    nonconformance work that should be done as a compensatory effort because, on the first attempt to
    perform that work, the potential exists that some portion of the required work effort may be done or has
    been done incorrectly
  13. 13• Prevention (keeping errors out of the process) and inspection (keeping errors out of the hands of the customer).• Prevention (keeping errors out of the process) and inspection (keeping errors out of the hands of the
    customer).
  14. 14• Attribute sampling (the result either conforms or does not conform) and variables sampling (the result is rated on a continuous scale that measures the degree of conformity).• Attribute sampling (the result either conforms or does not conform) and variables sampling (the result is
    rated on a continuous scale that measures the degree of conformity).
  15. 15• Tolerances (specified range of acceptable results) and control limits (that identify the boundaries of common variation in a statistically stable process or process performance).• Tolerances (specified range of acceptable results) and control limits (that identify the boundaries of
    common variation in a statistically stable process or process performance).
  16. 16An inspection isthe examination of a work product to determine if it conforms to documented standards

Información

Descripción
PMP PMP - All Chapters Fichas sobre 08 PROJECT QUALITY MANAGEMENT, creado por miguelabascal el 13/07/2013.
Creado por
miguelabascal
Visitas
91
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?