Mapa mental
3.BP Modelling (4)
Contenido del mapa
3.BP Modelling (4)
1.Why Model Processes
- 1.To describe and communicate BP i.e. for Training and legislative requirements
- 2.Analyze process for improvement, standardization, in preparation for growth or any change requirement
- 3.To automate oe enact a process and transfer it to executable code
2.Different BP Modelling Languages (BPML)
- 0.Regaining Models and Notations
- 1.UML 2.0 Activity Diagram
- 2.BPDM
- 3.Business Process Model and Notation (BPMN)
- 4.EPC
- 5.RAD
- 6.BPML Features
3.BPMN (Current Standard)
- Pools and Lanes
- Connectors
- Events and Tasks
- Gateways
- Collaboration Diagrams
- 2.Process modelling guidelines (PMG)
- 1.G1:Use few elements in model as possible
- 2.G2:Minimize routing paths per element
- 3.G3: Use one start and one end event
- 4.G4: Model as structured as possible
- 5.G5: Avoid OR routing elements
- 6.G6: Use verb-object activity labels
- 7.G7: Decompose the model if it has more than 50 elements
4.BPMN Tools
- Architecture Integrated Information System (ARIS)
Información
- Descripción
- Information Technology Mapa Mental sobre 3.BP Modelling (4), creado por Dillon Woodman el 15/09/2017.
- Creado por
- Dillon Woodman
- Visitas
- 0
- Valoración