¡GoConqr estrena diseño! Cuéntanos qué te parece.

Mapa mental

SAB6#88Quality_Control

Haggen Weg Español

Contenido del mapa

SAB6#88Quality_Control

  1. Project Management Plan

    • Describes how Quality Control will be performed within the Project
  2. Quality Metrics

    • Describes a Project or Product attribute and how it will be measured. Examples: Function Points. Mean Time Between Failure (MTBF). Mean Time To Repair (MTTR)
  3. Quality Checklist

    • It's a structured list that helps to verify that the work of the Project and its deliverables fulfill a ser of requirements
  4. Work Performance Data

    • Planned Vs. Actual Technical Performance
    • Planned Vs. Actual Schedule Performance
    • Planned Vs, Actual Cost Performance
  5. Approved Change Request

    • Defect Repairs
    • Revised Work Methods
    • Revised Schedule
  6. Deliverables

    • Any unique and verifiable product, result or capability that results in a validated deliverable required by the Project
  7. Project Documents

    • Agreements
    • Quality Audit reports and Change logs supported with corrective action plans
    • Training plans and assessments documentation of effectiveness
    • Process documentation obtained using the 7 basic quality tools or the quality management and control tools
    • (...)
  8. OPAs - Organizational Process Assets

    • Organization's Quality Standards and Policies
    • Standard work guidelines
    • Issue and defect reporting procedures and communication policies
    • (...)
  9. Quality Control Measurements

    • Are the documents results of control quality activities. They should be captured in the format specified through the Plan Quality Management Process
  10. Validated Changes

    • Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided
      • Rejected Items may require rework
  11. Validated Deliverables

    • Control Quality process determines the correctness of deliverables
      • Verified deliverables are an input to Validate Scope for formilized acceptance
  12. Work Performance Information

    • Is the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas
      • For example: Information about the project requirements fulfillment such as causes for rejection, rework required, or the need for process adjustments
  13. Change Request

    • If the recommended corrective or preventive actions or a defect repair requires a change to the Project Management Plan, a change request should be initiated in accordance with the defined Perform Integrated Change Control
  14. Project Management Plan Updates

    • Quality Management Plan
    • Process improvement plan
    • (...)
  15. Project Documents Updates

    • Quality standards
    • Agreements
    • Quality audit reports and change logs supported with corrective action plan
    • Training plans and assessments of effectiveness
    • Process documentation
      • Information obtained using the 7 basic quality tools
      • Information obtained using the quality management and control tools
    • (...)
  16. OPAs Updates

    • Completed Checklist
    • Lesson learned documentation
    • (...)
  17. 7 Basic Quality Tools

  18. Statistical Sampling

  19. Inspection

  20. Approved Change Request Review

Información

Descripción
Mapa Mental sobre SAB6#88Quality_Control, creado por Haggen Weg el 14/06/2015.
Creado por
Haggen Weg
Visitas
10
Valoración

Más sobre Quality Control and Inspection

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?