Mind map
SAB6#88Quality_Control
Map content
SAB6#88Quality_Control
Project Management Plan
- Describes how Quality Control will be performed within the Project
Quality Metrics
- Describes a Project or Product attribute and how it will be measured. Examples: Function Points. Mean Time Between Failure (MTBF). Mean Time To Repair (MTTR)
Quality Checklist
- It's a structured list that helps to verify that the work of the Project and its deliverables fulfill a ser of requirements
Work Performance Data
- Planned Vs. Actual Technical Performance
- Planned Vs. Actual Schedule Performance
- Planned Vs, Actual Cost Performance
Approved Change Request
- Defect Repairs
- Revised Work Methods
- Revised Schedule
Deliverables
- Any unique and verifiable product, result or capability that results in a validated deliverable required by the Project
Project Documents
- Agreements
- Quality Audit reports and Change logs supported with corrective action plans
- Training plans and assessments documentation of effectiveness
- Process documentation obtained using the 7 basic quality tools or the quality management and control tools
- (...)
OPAs - Organizational Process Assets
- Organization's Quality Standards and Policies
- Standard work guidelines
- Issue and defect reporting procedures and communication policies
- (...)
Quality Control Measurements
- Are the documents results of control quality activities. They should be captured in the format specified through the Plan Quality Management Process
Validated Changes
- Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided
- Rejected Items may require rework
- Any changed or repaired items are inspected and will be either accepted or rejected before notification of the decision is provided
Validated Deliverables
- Control Quality process determines the correctness of deliverables
- Verified deliverables are an input to Validate Scope for formilized acceptance
- Control Quality process determines the correctness of deliverables
Work Performance Information
- Is the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas
- For example: Information about the project requirements fulfillment such as causes for rejection, rework required, or the need for process adjustments
- Is the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas
Change Request
- If the recommended corrective or preventive actions or a defect repair requires a change to the Project Management Plan, a change request should be initiated in accordance with the defined Perform Integrated Change Control
Project Management Plan Updates
- Quality Management Plan
- Process improvement plan
- (...)
Project Documents Updates
- Quality standards
- Agreements
- Quality audit reports and change logs supported with corrective action plan
- Training plans and assessments of effectiveness
- Process documentation
- Information obtained using the 7 basic quality tools
- Information obtained using the quality management and control tools
- (...)
OPAs Updates
- Completed Checklist
- Lesson learned documentation
- (...)
7 Basic Quality Tools
Statistical Sampling
Inspection
Approved Change Request Review
Information
- Description
- Mind Map on SAB6#88Quality_Control, created by Haggen Weg on 14/06/2015.
- Created by
- Haggen Weg
- Views
- 10
- Rating
More on Quality Control and Inspection