¡GoConqr estrena diseño! Cuéntanos qué te parece.

Test

ISTQB Foundation Software Testing A

Robyn Babbage 40 preguntas 3,7 (3 valoraciones)

Hacer el test

Este test tiene tiempo límite, así que se abre en el reproductor de siempre.

Preguntas del test (40)

  1. 1Which of the problems below BEST characterises a result of a software Failure? (K1)
    1. ADamaged reputation
    2. BLack of methodology
    3. CInadequate training
    4. DRegulatory compliance
  2. 2What should be taken into account to determine when to stop testing? (K2)

    I. Technical risk
    II. Business risk
    III. Project constraints
    IV. Product documentation
    1. AI and II are true; III and IV are false
    2. BIII is true; I, II and IV are false
    3. CI, II, and IV are true; III is false
    4. DI, II, and III are true; IV is false
  3. 3What is the process of analysing and removing causes of failures in software? (K1)
    1. AValidation
    2. BTesting
    3. CDebugging
    4. DVerification
  4. 4Which general testing principles are characterised by the descriptions below? (K2)

    W. Early testing
    X. Defect clustering
    Y. Pesticide paradox
    Z. Absence-of-errors fallacy

    1. Testing should start at the beginning of the project
    2. Conformance to requirements and fitness for use
    3. Small number of modules contain the most defects
    4. Test cases must be regularly reviewed and revised
    1. AW1, X2, Y3 and Z4
    2. BW1, X3, Y4 and Z2
    3. CW2, X3, Y1 and Z4
    4. DW1, X4, Y2 and Z3
  5. 5Which of the following MAIN activities is part of the fundamental test process? (K1)
    1. AInitiating and planning
    2. BDocumenting root causes
    3. CCapturing lessons learned
    4. DPlanning and control
  6. 6Which are the following are MAJOR test implementation and execution tasks? (K2)

    I. Repeating test activities
    II. Creating test suites
    III. Reporting discrepancies
    IV. Logging the outcome
    V. Analysing lessons learned
    1. AII, III, and IV
    2. BI, III, IV, and V
    3. CI, II, III, IV
    4. DIII, IV, and V
  7. 7What principle is BEST described when test designs are written by a third party? (K1)
    1. AExploratory testing
    2. BIndependent testing
    3. CIntegration testing
    4. DInteroperability testing
  8. 8Which test levels are USUALLY included in the common type of V-model? (K1)
    1. AIntegration testing, system testing, acceptance testing, and regression testing
    2. BComponent testing, integration testing, system testing, and acceptance testing
    3. CIncremental testing, exhaustive testing, exploratory testing, and data driven testing
    4. DAlpha testing, beta testing, black-box testing, and white-box testing
  9. 9What test can be conducted for off-the-shelf software to get market feedback? (K1)
    1. ABeta testing
    2. BUsability testing
    3. CAlpha testing
    4. DCOTS testing
  10. 10Who OFTEN performs system testing and acceptance testing, respectively? (K2)
    1. ASenior programmers and professional testers
    2. BTechnical system testers and potential customers
    3. CIndependent test team and users of the system
    4. DDevelopment team and customers of the system

Información

Descripción
40 questions relating to the ISTQB Foundation software tester qualification syllabus
Idioma
English
Visitas
905
Valoración
3,7 de 5 · 3 valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?