  1. 1Kaplan (Documentation): When preparing specifications relating to moisture control, an architect should rely on
    1. AA. manufacturers' literature.
    2. BB. the local building code.
    3. CC. personal judgement and experience.
    4. DD. all of the above.
  2. 2Kaplan (Documentation): Construction Work is divided among the construction trades in accordance with the

    I. specifications.
    II. drawings
    III. trade union rules
    IV. General Contractor's judgement.
    1. AA. IV only
    2. BB. I, II, III, and IV
    3. CC. III and IV
    4. DD. I, II, and III
  3. 3Kaplan (Documentation): Which type of information is NOT normally contained in construction drawings?
    1. AA. Dimensions
    2. BB. Level of Quality
    3. CC. Quantities
    4. DD. Configurations
  4. 4Kaplan (Documentation): Shop drawings provide the architect with information on which of the following? CHECK ALL THAT APPLY.
    1. AA. Installation details
    2. BB. Equipment Operating Data
    3. CC. Color and Texture
    4. DD. Standard of workmanship
  5. 5Kaplan (Documentation): A Project Manual contains

    I. the drawings.
    II. the general conditions of the contract for construction.
    III. instructions to bidders.
    IV. sample contract administration forms.
    V. the bid form.
    1. AA. II and IV (Gen Conditions, sample contract admin forms)
    2. BB. I, III, and V (dwgs, instructions to bidders, bid form)
    3. CC. II, III, IV, and V (General Conditions, Instructions to bidders, bid form)
    4. DD. I, II, III, IV, and V (the drawings, the general conditions of the contract for construction, instructions to bidders, sample contract administration forms, the bid form.
  6. 6Kaplan (Documentation): All of the following statements about DESCRIPTIVE SPECIFICATIONS are true EXCEPT
    1. AA. they describe desired end results.
    2. BB. they make the architect responsible for proper performance of the specified items.
    3. CC. they explain all components of the specified items in detail.
    4. DD. they describe the arrangement and assembly of the components of the specified items.
  7. 7Kaplan (Documentation): Cash allowance specifications
    1. AA. require the contractor to set aside money in the bid to be applied to the cost of an item of work once the level of quality is known.
    2. BB. provide that the owner will obtain a discount for construction materials he or she purchases with cash.
    3. CC. provide that the owner will be rebated a cash amount for each specified item that the contractor can buy at a discount.
    4. DD. establish a fixed price for each unit of material so that a final id amount can be calculated once quantities are known.
  8. 8Kaplan (Documentation): When selecting mechanical systems for a project, the architect and mechanical engineering consultant should consider which of the following factors?

    I. Skill of the owner's maintenance staff
    II. Weight of the equipment
    III. Noise characteristics of the equipment
    IV. Operating Clearances
    1. AA. II and IV
    2. BB. II, III, and IV
    3. CC. III only
    4. DD. I, II, III, and IV
  9. 9Kaplan (Documentation): Reference Specifications are
    1. AA. comprehensive specification checklists to which an architect refers at the start of each new job.
    2. BB. used by architects to refer contractors to federal or other standard specifications that are to apply to work on the project.
    3. CC. proprietary systems like MASTERSPEC to which architects may subscribe.
    4. DD. useful because they do not have to be updated once the initial research is done.
  10. 10Kaplan (Documentation): All of the following statements about PERFORMANCE specs are true EXCEPT
    1. AA. they include test parameters for the items specified.
    2. BB. they make the contractor responsible for proper performance of the specified items.
    3. CC. they explain all components of the specified items in detail.
    4. DD. They are best used for new or unusual situations.

Información

Descripción
[Documentation/ Quality Mgt & Coordination]
Idioma
English
Visitas
48
Valoración
Aún sin valoraciones
Valora este test
Valora este test

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?