A2 IT Project Management

Cards in this deck (84)
- 1ConceptionStart of a project
- 2Gantt chartA chart used for planning a project
- 3ExecutionThe development stage of a project
- 4ClosureCompletion of a project
- 5Why do projects need to be managed properlyThis is in order to ensure deadlines are met, resources are available and everybody knows what they're doing
- 6What happens during the conception stageThe initial ideas for a project are identified and goals are met. Decisions are made if a project is appropriate by doing a feasibility study which determines whether or not the project will benefit the organisation
- 7Roles of stakeholders in conceptionRequirements are set so that stakeholders know what to expect of the project. Objectives of the project, its scope, risks and approximate budget and approximate timescales will be agreed between the stakeholders
- 8Why is planning essentialSo that stakeholders know their responsibilities during all stages. Ensure that the appropriate amount of time for each part of the project is allocated
- 9What goes on in the planning stageA comprehensive budget will be formulated along with the details of timescales. Milestones will be set, by that time certain parts of the project must be complete. These parts/tasks will be identified and prioritized
- 10What does a Gantt chart look like

- 11Why is the execution importantIt is critical that the plan is followed so that resources are used at appropriate times as any delays will have a knock back effect on successor tasks
- 12Why is monitoring and control importantThis is essential to project managements as they will be responsible for ensuring tasks are completed on time and monitor the performance of each team member. They also monitor expenditure and compare it to the budget set intially
- 13Why is closure importantHandover from the project manager to the client. This is where contracts will be terminated so some team members may need to find alternative work. Review of the project will take place where the success will be evaluated between the client and PM
- 14CollaborationWorking together
- 15Desktop project management softwareThis requires installation to a specified computer or set of computers. Where there is only one project manager for monitoring, this can be useful for sophisticated tasks. Some software allow for multi-user access, but as communication cannot be used within the software, collaboration can be difficult
- 16Web based project management softwareThis can be accessed through a browser where it is installed on an intranet or in the cloud. There can be delays in processing data and it requires an internet connection but collaboration can take place as it can be accessed by any user on any computer
- 17Single user project management softwareThis is a type of desktop system that is tailored to small projects for one project manager to use only and so it prevents any type of collaboration and communication
- 18Personal project management softwareSoftware that the home users/clients can use to become the project manager. It will be single user and include a simple interface with basic features such as: timeline, task management and resource planning
- 19Collaborative project management softwareThis is software intended to be used by several workers at once. There may be several sub project managers who are responsible for updating parts of the plan. This type of software is usually web based or delivered on a client server model
- 20Critical pathThe tasks which must be completed on time for a project to complete on time
- 21Planning in project management softwareMost of the planning is concerned with scheduling tasks and allocating resources to those tasks. However, key milestones can be identified with success criteria.
- 22Scheduling of tasks in project management softwareSoftware will allow the users to create a Gantt chart to show an overview of the tasks needed to complete on a timeline
- 23Features of Gantt chartsTasks assigned will have an estimated duration they will take to complete
The project manager will identify which tasks are dependent upon other tasks
Tasks can be delegated to other members
How many hours have been spent on each task will be shown
Milestones can be identified - 24Resources in project management softwareCosts are assigned to task so the project manager can see how their use will affect the budget and help avoid resource conflicts and identify member overloads
- 25Costings in project management softwareThe project manager will be able to calculate the total cost of each task based on how many hours each resource is used. It can keep a record of all expenses
- 26Communication in project management software (Calendar)Each team member will have a calendar showing what they are doing at what time. This enables meetings to be schedules with each team member as well as attachments for documents
- 27Communication in project management software (IM / video chat / video conference)These tools will enable team members who are working remotely from each other to communicate in real time so that they can share ideas and discuss progress
- 28Communication in project management software (Shared documents)All documents are stored in a central storage unit or server for each team member to access. Documents can be assigned to tasks, resources or milestones so that they are available when needed. Changes to documents can be tracked and can notify team members.
- 29Communication in project management software (Discussions/forums)These can be set up for tasks, documents or milestones so that discussions between team members can be held. Useful when team members aren't available at the same time and comments and suggestions can be added
- 30Communication in project management software (Progress)The software can inform members and the manager of the progress that is being made. Tasks can be updated to show how near to completion they are
- 31Decision making in project managementCommunication can be logged so it is clear to see what decisions have been made and by who. If problems are occurring, the software will highlight tasks to see what adjustments will need to be made.
- 32Feedback in project mangamentGraphs, charts and reports can be used to analyse the budget, scheduling and task progress. Comparisons can be made and decisions can be made according to these
- 33PredecessorA task in project management that must be completed before another task can start
- 34Critical Path AnalysisFinds a projects critical path. Which identifies which tasks much be completed on time for the whole project to complete on time, and defines the minimum time in which the project can be completed
- 35Float timeThe float time is the time an activity can be delayed without affecting the rest of the project
- 36What information is needed to create a CPAThe list of tasks
How long each task will take
Which tasks are dependent upon predecessors - 37Disaster Recovery PlanNeeded for disaster events so that recovery can be completed as quickly and effectively as possible, minimizing disruption to the organization
- 38Risk assesmentInvolves identifying the potential risks to an organisation, analyzing the potential impact to the organisation and the likelihood of each risk occurring
- 39List of potential hazardsPower cut
Fire
Flood
Denial of access to premises
Malware
Unauthorized access to data
Theft of data
Corruption of data
Loss of key personel - 40PerpetratorsPeople who could deliberately cause problems
- 41How likelihood is calculatedOn a scale of 0.0 to 1.0
1 being 100% certainty - 42Examples of impact to the businessLoss of revenue
Damage to organisation's image
Penalty fees
Cost of recovery
Effect on other business activities - 43Categories in which business activities can be put inActivities which must continue
Activities which could be scaled down
Activities which could be suspended - 44How to calculate riskRisk = Likelihood x Impact
- 45How to secure risksAccess rights and password
Bio-metric security
Firewalls
Backups
Encryption
Malware security
Physical security methods - 46Recovery managementProcedures need to be put into place to plan for recovery after a disaster has occured
- 47Activities in recovery managementRestoration of backups
Replacement of hardware
Re installation of software
Emergency replacement of key personnel
Emergency office accommodation - 48RPO (Recovery Point Objective)The point in time prior to the disruption to which data must be recovered
- 49MTD (Maximum Tolerable Downtime)This is the maximum time that each business activity could tolerate not having access to their essential system functionality
- 50RTO (Recovery Time Objective)This is the estimated maximum amount of time that the organisation or business activity has in which to recover its systems and resume operations
- 51Recovery testingImportant to test disaster recovery plans such as restoring data and systems. Backed up data should be tested daily to ensure that the backup process has succeeded
- 52PrototypeA 'mock up' of a software or manufactured solution
- 53RADRapid application development
Uses prototyping to develop a system in a very short time frame, usually less than six months. - 54Uses of prototypesIt is used during the design stage to demonstrate how a system will look will and work. Used so that the client can get a feel for the new system and provide any feedback as well as comparing it to the requirement specification
- 55Evolutionary/incremental prototypingThis type of prototyping is where the requirements are specified, an initial prototype is developed, the prototype is then reviewed and then requirements are clarified and the prototype is improved based on feedback
- 56Benefits of using evolutionary prototypingEnd users may request enhanced or new features that they discover they require as the prototypes are being developed, features they would've have thought of at the initial requirements. Users can get used to using the parts of the system before the whole
- 57Throwaway/rapid prototypingThe prototype will never become part of the final delivered software, but will be discarded. A loosely, working model is created following a short investigation with the aim being to have something to show to clients to get feedback ASAP
- 58Diagram of evolutionary prototyping

- 59Diagram of throwaway prototyping

- 60Benefits of rapid developementEnables the requirements to be fine tuned early in the process which is more cost effective than to continually improve. The main aspect to the prototype will be the user interface which the client will be able to test and experience
- 61Advantages of prototypingProblems can be identified early during the process and modifications made before it become costly to change
Requirements can be clarified and refined
The end users will be involved more in the process giving them more ownership
The developers will have a much better understanding of what the users are expecting - 62Disadvantages of prototypingRequirement analysis can be rushed, meaning prototypes don't reflect much of what the end users were expecting
They can often get lots of ideas about features they would like included, which can lead to disappointment if these features can be funded
Initial costs of developing a prototype are high compared with traditional designs - 63Drawbacks of throwaway prototypesThe prototype will become rushed and when trying to develop it into a working system, it may have significant design flaws that carry through to the end solution
May have false expectations of the timescale to develop a real working solution - 64Drawbacks of iterative prototypingFeedback can sometimes last too long if the user is regularly wanting changes to be made to the latest prototype
- 65How are requirements gathered for RADFocus groups
- 66JADJoint Application Development
Where users are key players and provide feedback to the prototyping for refinements - 67How are deadlines met in RADStrict deadlines are allocated to the development of the system by allocating time boxes to the development of each requirement
- 68Other features of RADReuse modules of software that already exist, rather than developing form scratch.
- 69How users get involved in RADSoftware application frameworks can be used to develop the solution whereby a complex graphical user interface can be created using drag and drop functionality
- 70Waterfall methodRequirements
Design
Implementation
Verification
Maintenance - 71Requirements in the waterfall methodThere will be lots of communication with the user at this stage in order to elicit the requirements of the potential solution
- 72Design in the waterfall methodThe interface and structure of the system will be designed.
- 73Implementation in the waterfall methodThe system will be developed which often involves programming
- 74Verification in the waterfall methodEnsure the project meets the customer's requirements
- 75Maintenance in the waterfall methodThe system will then be used and during its use there may be problems that are discovered that need to be corrected or other changes that need to be made
- 76Advantages of RADUser involvement means that the end solution is more likely to be suitable for the end users
Evolutionary approach of RAD enables the requirements to involve
It is quickly recognized when requirements are over ambitious and so can be simplified
The strict deadlines ensure that the project will be completed on time
Prototyping of the interface with user involvement means less time is spent on design and more on development
Software application frameworks mean that a user interface can be developed quickly and users can even be involved in configuring the layouts of screens and reports - 77Disadvantages of RADRequirements are not clearly specified from the outset and so the final solution may not meet the entire needs
Users are required throughout the whole process which can lead to work overload
The structure of the system may be compromised, as the focus is on the user interface
The strict deadlines means that some parts may be rushed
Existing software modules will not have been designed for the exact requirements
Users not involved in JAD approach may feel left out - 78CADComputer aided design
- 79CAMComputer aided manufacture
- 80How does CAD workUses vector graphics to create objects in two dimensions or three dimensions . Objects can be stretched, resized and moved and properties such as material and colour can be changed
- 81What are object librariesAvailable in CAD software so that the user can select standard objects. E.g. if designing a house, an object library could include steel beams, walls, windows etc.
- 82Application for CAD/CAM includeLandscaping
Vehicle Manufacturing
Textiles production
Carpentry
Manufacturing of components
Printed circuit board - 83Benefits of CAD and CAMExpensive prototypes are not always necessary as users can experience 3D models
CAD drawings can be modified and enhanced without manufacturing cost
A list of required materials can be produced from the CAD drawings automatically
CAD models can be viewed from many angles by rotating the model and elements can be magnified
Components that have been designed once can be reused
CAD requires fewer designers than traditional drafters and so it is cheaper for busienss
CAM enables products to be mass-produced consistently
CAM is more precise than manufacturing by hand
Manufacturers drawings can be created seamlessly
CAM removes the need for manual labour and so reduces costs - 84Drawbacks of CAD and CAMBoth CAD and CAM have led to the loss of jobs and the need for re-skilling of employees
Testing using a model will never provide the same results as testing using the manufactured product
Although a user can experience a 3D model, it is not the same as walking through a real building
CAD software is very complex and so highly trained staff are required to use it
Initial costs of purchasing CAD software can be high
Design developed with CAD can include errors made by the designer as the software is not intelligent enough
Designers are limited to using vector objects based on geometrical modelling