Site Planning and Enabling Works

Connor Benning Quantity Surveying English 19 cards

Cards in this deck (19)

  1. 1What should be included within site set-up?Access and Egress (public, vehicle, labour)
    Boundaries/Fencing
    Security
    Material storage
    Welfare facilites
    Site offices and accommodation
    Site signage
    Space for scaffolding and hoists around buildings
  2. 2What should be considered in site set up?Welfare
    Utilities
    Safe access/exit
    Material storage
    Work sequence
    Boundaries
  3. 3What does CoCP stand for?Code of construction practise
  4. 4What is the CoCP?Set of standards and procedures to which a contractor much adhere in order to manage and reduce potential environmental impacts from there work
  5. 5What could be contained within local authorities CoCP?- permitted working hours
    - noise, dust regulations
    - air pollution regs
    - access and exit routes
    - traffic management
    - waste management
    - landscape protection
    - liaison with neighbours
    - ecology
  6. 6Where can you find the CoCP?Usually in planning permission or contract documents
  7. 7How should transport be managed be used during basement excavation?Suitable material storage, good plans should be in depth as there will be lots of materials on site (excavated) needs to ensure limited disruption to the local area
  8. 8When is wheel washing?Should be used whenever large machinery leaves site, reduces dust and mud nuisance on nearby roads
  9. 9State the regulations in reference to water protection?It is an offence to knowingly permit pollution of water either deliberately or accidentally
    Formal consent is required for discharge into water
    Water resources act 1991
  10. 10State how waste should be managed on site?Demolition material crushed on site for reuse as concrete aggregate or sub-base material
  11. 11What is the included in the considerate contractors scheme?- positive consideration of neighbours (noise, pollution)
    - Safe work on site
    - Respectful behaviour (swearing and abuse)
    - Communication and updates for neighbours
    - Cleanliness i.e keeping sites clean and tidy
  12. 12What are the three types of site?Open field
    Long/thin
    Resticted
  13. 13What is an open field site?Large area where only a portion of the site is being used, lots of access points, lots of space for material storage, usually factory redevelopments or housing estates
  14. 14What is a long/thin site?Limited width, lack of access, lack of material storage, higher consideration for surroundings, usually roads, motorways, bridges
  15. 15What is a restricted site?Whole site is being used for development, requires complex phasing, lack of access and limited material storage, usually industrial improvement or city infrastructure
  16. 16What are the two golden rules to site planning?- Always secure the most difficult boundary first
    - Recreate space at or near ground level as soon as possible
  17. 17What are enabling works?A collection of upfront activities which allow a site to be fully investigated
    can vary from pre construction investigation to erecting props in a basement
  18. 18What is a method statement?issued as part of the contract procedures, required to set of methods of construction used by contractors and subcontractors for each work section
  19. 19How should piling methods be selected dependant on location?Bored piling is better than driven in built up areas as there is less noise pollution