SLR 6 - Software Development

Jordan Larter English 33 cards

Cards in this deck (33)

  1. 1Steps of the Development Life CycleFeasibility
    Requirements
    Analysis and Design
    Implementation
    Testing
    Evaluating
    Maintenance
  2. 2FeasibilityDetermine if the problem can be solved with a program
    Should we proceed with development?
  3. 3RequirementsDetermine what the program needs to do to solve the problem
    Make a list of requirements which the client wants from the program
  4. 4Analysis and DesignHow should the program work?
    Define the structure of the program
  5. 5ImplementationProgramming the actual program
  6. 6TestingTest to see if the program works as intended
    Trying to find any bugs
  7. 7EvaluatingEvaluating if the program is complete
    Is it ready to release?
  8. 8MaintenanceOnce the program is released
    Updating and managing the program to make sure it carries on working after release
  9. 9Models of DevelopmentWaterfall model
    Rapid application development (RAD)
    Spiral model
    Extreme programming
    Paired programming
  10. 10Waterfall ModelEach phase has a clear start and end, connected like a chain. Can go backwards
    Client input only at beginning so the software may need to be redone
  11. 11Advantages of WaterfallSimple
    Easy to manage
    Defined start and end of stages
    Easy to work out time scale
    Easy to know next steps
  12. 12Disadvantages of WaterfallNot flexible
    High risk factor
    Misunderstandings lead to big errors
    Client is removed from development
    Poor choice for unsure requirements
  13. 13Rapid Application Development (RAD)Prototypes are made until a finished product is reached
    Each prototype is created then evaluated
    Each prototype takes a few weeks to be created
  14. 14Advantages of RADClient is involved
    Final program likely to meet client's requirements due to amount of testing
    Every prototype is evaluated by the client
    Prototypes make testing easier where different ideas can be tested
  15. 15Disadvantages of RADNeeds regular contact with client
    Does not scale well with larger projects
    Not suitable if efficiency is a priority
    Each cycle can take a few weeks
  16. 16Spiral ModelRisk driven approach to development
    4 stages - identifying objectives and purpose of each stage, designing, development and testing, plan the next iteration
    Starts with core foundations and repeats through the stages
  17. 17Advantages of SpiralFocuses on dealing with risks
    Each rotation focuses on the next part of the program
    Eliminates risks during development
    Works well for large scale projects with lots of risk and uncertainty
    Each part is evaluated before progression
  18. 18Disadvantages of SpiralRisk management is a specialised skill and is costly
    Going through each cycle takes time
    It takes longer than other methods
  19. 19Extreme ProgrammingFocuses on the idea that requirements shift during development
    Prototypes are developed very quickly
  20. 20Advantages of Extreme ProgrammingTakes into account that requirements may shift as the program is developed
    Prototypes are developed quickly so there is a lot of client feedback
  21. 21Disadvantages of Extreme ProgrammingA client is needed to be embedded into the team to provide instant feedback
  22. 22Paired ProgrammingTwo programmers sit at one computer, one codes and the other gives feedback
  23. 23Advantages of Paired ProgrammingQuality of code often very high
    Code is seen with fresh eyes so errors are usually spotted
    Code will be efficient
    Low amount of bugs
  24. 24Disadvantages of Paired ProgrammingHaving two developers work on one part means higher cost and time
    Lots of collaboration is needed
    Takes longer as less people are coding
  25. 25AlgorithmsAn algorithm is the logical steps needed to solve a problem
    Can be represented as a flow chart or pseudocode
  26. 26Testing StrategiesBlack box testing
    White box testing
    Alpha testing
    Beta testing
  27. 27Black Box TestingOnly tests inputs and outputs of the program
    If the output is expected then it passes
    Tests if the overall code works as intended
  28. 28White Box TestingTests every possible route the program can take
    Tests how efficient each part of the code is
  29. 29Alpha TestingHappens quickly
    Tested internally
    Very early version
  30. 30Beta TestingHappens after development
    Tested externally through sign-up programs
    Almost finished product
    Used to test things like load bearing and user input
  31. 31Valid DataValid data/normal data is data that is expected by the program. Tests if the program can identify and use correct data
  32. 32Borderline DataBorderline/boundary Data is on the boundaries of valid and invalid data. Tests what the program considers correct data
  33. 33Invalid DataInvalid/Extreme Data is data that usually should not be inputted. Tests how the program handles invalid inputs

Information

Description
Flashcards on SLR 6 - Software Development, created by Jordan Larter on 13/01/2020.
Created by
Jordan Larter
Views
5
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?