- 1What does the HTTP code 200 mean?OK
- 2What does the HTTP code 500 mean?Internal Server Error
- 3Explain the Scrum team as a carProduct Owner: Driver that sets destination
Dev Team: Engine making the car move forward
Scrum Master: Mechanic that tunes engine to optimize overall performance - 4Who is the sole person responsible for the Product Backlog?The Product Owner
- 5Describe the Product OwnerSole person responsible for maximizing the value of the product and the work of the Dev Team
- 6Describe the Dev TeamA group of professionals who do the work of delivering a potentially releasable increment of "done" product at the end of each sprint
- 7T/F: Developer is the only title recognized the Dev Team membersTrue
- 8T/F: Sub-teams are allowed in the Dev TeamFalse
- 9Describe the Scrum MasterEnsures that Scrum is understood and enacted. They do this by ensuring the Team adheres to Scrum theory, practices, and rules
- 10What is a Sprint?The heart of Scrum. A time-box of one month or less during which a "Done" potentially releasable product increment is created
- 11T/F: The Product Owner is the only one that can cancel a SprintTrue
- 12List the Scrum lifecycle in order~Sprint Planning
~Daily Scrum/Sprint Execution
~Sprint Review
~Sprint Retrospective - 13Describe the Sprint PlanningTime-box of max 8 hours where the Sprint's work is planned
- 14What two questions does Sprint Planning answer?~What can be delivered in the Increment from this upcoming Sprint?
~How will the work be achieved? - 15Describe the Daily Scrum15 minute event for the Dev Team to sync activities and create a plan for the next 24 hours
- 16Describe the Sprint ReviewHeld at the end of a Sprint to inspect the Increment and adapt the Product Backlog if needed
- 17Describe the Sprint RetrospectiveOpportunity for Team to inspect itself and create an improvement plan to be enacted during the next Sprint
- 18Describe the Product BacklogAn ordered list of everything that may be needed in the product. It's never complete
- 19Describe the Sprint BacklogThe set of product backlog items selected for a Sprint, plus a plan for delivering the increment and realizing the Sprint goal
- 20Fill the blanks The ____ Backlog makes visible all of the work the __________ identifies as necessary to meet the ____________Sprint
Dev Team
Sprint Goal - 21T/F: The Dev Team modifies the Sprint Backlog throughout the SprintTrue
- 22Describe what an "Increment" isThe sum of all the product backlog items completed during a Sprint
- 23How does a Contextual Inquiry work?Go where a customer works, observe them, and talk to them about the work to better understand your customer
- 24What is a wireframe?A visual diagram of how a piece of software may look. Sketches out functions and buttons
- 25What is a mockup?A visual diagram sketching out the styles, colors, and content of software
- 26What is a storyboard? (2)Collection of screen layout diagrams linked by arrows depicting events or the passage of time. Shows how screen changes in response to inputs
- 27What is CAP? (From Interaction Design Principles)~ Contrast: Make different things appear different
~ Alignment: Line-up stuff in a grid
~Proximity: Group related items together spatially - 28What is the purpose of Maven? What does it need to read?To manage a project's build, reporting from a central piece of info.
It needs an .xml file to read - 29What does an XML response look like? (Use id = 76, name = Michael)76
Michael - 30What does a JSON response look like? (Use id = 76, name = Michael){
"id": 76,
"name": "Michael"
}
Information
- Description
- CSC131 Flashcards on CSC131 Quiz 2, created by Michael Burns on 25/02/2020.
- Created by
- Michael Burns
- Views
- 3
- Rating