- 1THE TRADITIONAL PHASES OF CONSTRUCTION PROJECTS INCLUDE CONCEPT, PROMOTIONAL, DESIGN AND CONSTRUCTION.TRUE
- 2ALSO CONSIDER THE OPERATION AND MAINTENANCE AND DISPOSAL ACTIVITIES TO HAVE A VIEW OF THE ENTIRE LIFE CYCLE OF THE PROJECTTRUE
- 3THE SET OF DRAWINGS AND SPECIFICATIONS USED TO CONSTRUCAT A PROJECT IS REFERRRED TO AS WORKING DOCUMENTS OR CONSTRUCTION DOCUMENTSTRUE
- 4IN A TYPICAL CONSTRUCTION PROJECTM THE OWNER IS RESPONSIBLE FOR DEVELOPING MEANS AND METHODS TO ACCOMPLISH THE WORKFALSE
- 5IN A TYPICAL CONSTRUCTION PROJECT, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MANAGING A TEAM OF SUBCONTRACTORS AND MATERIAL SUPPLIERSTRUE
- 6A CHANGE ORDER IS A MODIFICATION OF THE SCOPE OF WORK DURING THE PROJECT BIDDING PROCESSFALSE
- 7THE MODIFIED VERSION OF THE ORIFINAL CONSTRUCTION DOCUMENTS TO REFLECT ACTUAL CONSTRUCTION PERFORMED IN THE PROJECT ARE CALLEDREVISED DRAWINGS
- 8THESE ARE RESPONSIBLE FOR OBTAINING BUILDING PERMITS FROM THE CITY/COUNTY BUILDING DEPARTMENT FOR THE PROJECTARCHITECTS
- 9USUALLY WINS CONTRUCTON PROJECTSLOWEST-PRICE PROPOSAL
- 10AMONG THE TEAM MEMBERS IN THE CONSTRUCTION PHASE OF A PROJECT AREOWNER, ARCHITECT, GENERAL CONTRACTOR
- 11THIS ALLOWS THE CONSTRUCTION MANAGER TO PARTICIMATE PROVIDE INPUT DURING THE DESIGN PHASECONSTRUCTION MANAGEMENT METHOD