SAB7#043_SCOPE_LEVELS
Activity
- PMI considers an activity to be a particular piece of work scheduled for the project.
Work package
- The work package is the lowest level on a WBS, the higher levels are used to categorize the work packages.
Control account
- Tool that allows for the analysis of work performance data regarding costs, schedule, and scope. Control accounts provide a way to manage and control costs, schedule, and scope at a higher level than the work package.