Mind map
Industrial conservation
Map content
Industrial conservation
COMPANY RESOURCES:
- This is the name given to all types of machinery: electrical, or mechanical, when they operate properly
- EQUIPMENT:
- Generation, distribution, and control systems for all types of energy.
- INSTALLATION:
- Buildings that serve for the establishment and communication of the company.
- BUILDINGS:
- This is the name given to all types of machinery: electrical, or mechanical, when they operate properly
USEFUL LIFETIME OF A RESOURCE:
- It is the time considered from the installation of the resource until he leaves the company for any reason.
- It is required to notify contingency personnel about the necessary resources
- ORGANIZATION TIME:
- It exists for unplanned reasons,
- STOPPING TIME:
- This is used to check the malfunction of the resource
- DIAGNOSIS TIME:
- SHELF TIME:
- It is required to notify contingency personnel about the necessary resources
- It is what is considered necessary for the operation of the resource.
- When the resource is working within the stipulated quality of service limits.
- OPERATING TIME:
- It is the one used to verify that the resource works properly and is provided with everything you need.
- PREPARATION TIME:
- Work and observe that their behavior is appropriate.
- HEATING TIME:
- When the resource is providing the service.
- WORKING TIME:
- ACTIVE TIME:
- When the resource is working within the stipulated quality of service limits.
- In this the resource is not considered necessary for the operation of the company.
- When it is considered that the resource has no need to deliver any service,
- IDLE TIME:
- Plan what is necessary to develop the corresponding routines or work orders.
- TIME FOR CONSERVATION PLANNING:
- That necessary to carry out the work supported by the routine or corresponding work order.
- TIME ROUTINES OR WORK ORDERS:
- The one that requires extensive maintenance work, usually covered by a special work order.
- OVERHAUL TIME:
- The time needed to make the entries in the work order or routine when the work is finished.
- REGISTRATION AND STATICS:
- Period in which the resource is stored because its services.
- STORAGE TIME:
- INACTIVE TIME:
- When it is considered that the resource has no need to deliver any service,
- It is the time considered from the installation of the resource until he leaves the company for any reason.
GENERAL ACTIVITIES:
- It consists of observing the resources to obtain information about their physical state or function.
- INSPECTION:
- Preservation and maintenance work, necessary periodically to obtain good appearance, duration, and operation of the resource.
- ROUTINES:
- Work carried out to correct the damages that a resource has
- REPAIR:
- It consists of replacing a machine or its component, which for any reason concept
- CHANGE:
- Works that are carried out to reform or correct the design or properties physical resources, to eliminate repetitive failures.
- MODIFICATION:
- It consists of observing the resources to obtain information about their physical state or function.
Information
- Description
- Mind Map on Industrial conservation, created by FELICITAS REYES FAVELA on 09/06/2022.
- Created by
- FELICITAS REYES FAVELA
- Views
- 0
- Rating