Mind map
MODELS OF INNOVATION PROCCESS
Map content
MODELS OF INNOVATION PROCCESS
FIRST GENERATION
- TECHNOLOGY PUSH
- - Simple linear sequential process
- - Emphasis on R&D
- -The market is a receptacle for the fruits of R&D
- - Emphasis on R&D
- - Simple linear sequential process
- TECHNOLOGY PUSH
SECOND GENERATION
- NEED-PULL
- -Simple linear sequential process
- -Emphasis on marketing
- -The market is the source of ideas for directing R&D
- -R&D has a reactive role
- -The market is the source of ideas for directing R&D
- -Emphasis on marketing
- -Simple linear sequential process
- NEED-PULL
THIRD GENERATION
- COUPLING MODEL
- -Sequential
- -With feedback loops
- -Push or pull or push/ pull combinations
- -R&D and marketing more in balance
- -Emphasis on integration at the R&D/marketing interface
- -R&D and marketing more in balance
- -Push or pull or push/ pull combinations
- -With feedback loops
- -Sequential
- COUPLING MODEL
FOURTH GENERATION
- INTEGRADE MODEL
- -Parallel development with integrate development teams
- -Strong upstream supplier linkages
- -Close coupling with leading edge customers
- -Emphasis on integration between R&D and manufacturing
- -Horizontal colaboration
- -Emphasis on integration between R&D and manufacturing
- -Close coupling with leading edge customers
- -Strong upstream supplier linkages
- -Parallel development with integrate development teams
- INTEGRADE MODEL
FIFTH GENERATION
- SYSTEM INTEGRATION AND NETWORKING MODEL (SIN)
- -Fully integrated parallel development
- -Use of experts systems and simulation modelling in R&D
- -Strong linkages with leading edge customers
- -Strategic Integration with primary suppliers including co-development f new products and linked cad systems
- -Horizontal linkages: Joint Ventures, colaborative research groupings etc.
- -Emphasis on corporate flexibility and speed of development ( time-based strategy)
- -Increased focus on quality and other non-price factors
- -Emphasis on corporate flexibility and speed of development ( time-based strategy)
- -Horizontal linkages: Joint Ventures, colaborative research groupings etc.
- -Strategic Integration with primary suppliers including co-development f new products and linked cad systems
- -Strong linkages with leading edge customers
- -Use of experts systems and simulation modelling in R&D
- -Fully integrated parallel development
- SYSTEM INTEGRATION AND NETWORKING MODEL (SIN)
Information
- Description
- Mind Map on MODELS OF INNOVATION PROCCESS, created by karencita-1.4 on 11/10/2015.
- Created by
- karencita-1.4
- Views
- 1
- Rating