SAB9#47_Controlling_Scope
  1. I have to do if there is a change in project scope ?
    1. variance analysis.
      1. This tool is the difference analysis between the baseline and the actual work, serves to determine if the plan needs to be corrected. If so, then recommended corrective action, and disseminate through the recommendation a change control
      2. The goal of Control Scope is updating the scope, plan, baseline, and WBS info
        1. This process will tell us if we are right or not, regarding the planned scope and if we are controlling the changes that appear in the project
          Show full summary Hide full summary

          Similar

          Gender Theorists
          Hazel Meades
          GCSE Chemistry C1 - Carbon Chemistry ATOMS, MOLECULES AND COMPOUNDS (Easy)
          T W
          The First, Second, Third and Fourth Crusades
          adam.melling
          Key Biology Definitions/Terms
          mia.rigby
          Frankenstein by Mary Shelley
          nina.stuer14
          Conceptos Generales De Robótica
          fede ramos
          Unit 2 flashcards
          C R
          Computer Systems
          lisawinkler10
          The Berlin Crisis
          Alina A
          GCSE AQA Chemistry 2 Salts & Electrolysis
          Lilac Potato