Short Answer // Theory Questions

Ofa Halatanu English

Short Answer // Theory Questions

Map content

Short Answer // Theory Questions

  1. LEC06 - Pile Foundations I

    • How to choose a foundation type"
    • General Structure of a Pile
    • Applications of Pile Foundations
    • Pile Design Code:
      • Regardless of the type of Pile, they must satisfy 2 design criteria:
        • Bearing Capacity
          • NZ Building Code B1:2008 says that the ultimate axial compressive pile strength must consider:
            • Geotechnical design (shaft base resistance + shaft resistance --- Qu = Qp + Qs)
            • Static Load testing - the load that produces settlement of 0.1 pile width/bell/bulb
        • Settlement
          • Settlement must be within the allowed limit (NZ Building Code B1:2008 --- PIle Foundations <= 0.1 pile width/bell/bulb)
    • Pile Design Methods
      • Satisfy the rules:
        • Simplified Rules: (Presumed bearing capacity and zero shaft friction)
        • Code of Practice
      • Rational Design Method:
        • Based on soil/rock mechanics principles and/or empirical relationships
        • Needs adequate ground investigation, in-situ and lab tests
        • Consider geotechnical capacity and settlement
        • May require instrumented pile loading tests to verify design assumptions
        • More Economic design can be achieved
    • Classifications of Piles:
      • Based on Construction Materials:
        • Steel Piles
          • Qall.s = As x fs
            • Qall,s = allowable structural capacity of steel pile
            • As = cross-sectional area of the steel
            • fs = allowable stress of steel (approx. 0.33 - 0.5 fy), minimum yield strength
          • Advantages:
            • Easy to handle with respect to cut-off and extension to the desired length
            • Can stand high driving stresses
            • Can penetrate hard layers such as dense gravel and soft rock
            • HIgh load-carrying capacity
          • Disadvantages:
            • Relatively costly
            • High level of noise during pile driving
            • Subject to corrosion (can prevent this but coating or cathodic protection)
            • May be damaged of deflected during driving through hard layers or major obstructions
        • Concrete Piles
          • Pre-Cast concrete piles
            • Ordinary Reinforcement --- Qall,s = 300 - 3000kN
            • Pre-stressed reinforcement --- Qall,s = 7500 - 8500kN
            • Advantages
              • Can be subject to hard driving
              • Resistant to corrosion
              • Can be easily combined with a concrete superstructure
            • Disadvantages
              • Difficult to achieve proper cut off
              • Difficult to transport
          • Cast-in-situ concrete piles
            • Cased Cast-In-Situ
              • Qall,s = (As x fs)+ (Ac x fc)
                • Qall,s = allowable structural capacity of cased pile
                • As = cross-sectional area of steel
                • fs = allowable stress of steel
                • Ac = cross-sectional area of concrete
                • fc = allowable stress of concrete
              • Advantages:
                • Relatively cheap
                • Allow for inspection before pouring concrete
                • Easy to extend
              • Disadvantages:
                • Difficult to splice after concreting
                • Thin casings may be damaged during driving
            • Uncased Cast-In-Situ
              • Qall,s = Ac x fc
              • Advantages
                • Initially economic
                • Can be finished at any elevation
              • Disadvantages
                • Voids may be created if concrete of rapidly placed
                • Difficult to splice after concreting
                • In soft soils, the sides of the hole may cave in
          • Continuous Flight Auger Piles (CFA)
            • Advantages:
              • Noise and vibrations during construction are minimized
              • Eliminates splicing and cutoff
            • Disadvantages:
              • Structural integrity is less reliable
              • Soil spoils need collection and disposal
            • Also known as: auger-cast, auger-cast-in-place, auger-pressure grout piles
              • Drilling by continuous flight augers
              • Drilling to the final depth in one continuous process
              • Gradually pulling the auger and pumping concrete into the hole
              • Placing reinforcement immediately after withdrawal of auger
        • Timber Piles
          • These must comply with: NZ3603:1993 (Timber Structures Standard) or NZS 3605:2001 (Timber Piles and poles for use in buildings) and are treated as recommended by NZS 3604:2011 (Timber Framed Buildings)
          • Qall,s = Ap x fw
            • Ap = average area of cross-section of timber pile (m2)
            • fw = allowable stress of the timber (kN/m2)
        • Composite Piles
          • Pre-cast concrete pile over timber pile (economic)
          • Cast-in-Situ concrete pile over Steel H Pile - limitation in designed length)
      • Based on Soil Disturbance & Installation Method
        • Driven Piles (Displacement PIles)
          • Installation by pile driving methods --- Hammering piles into the ground using sufficient energy --- use a dynamic driving force calculated to match the structural capacity
        • Bored Piles (Non-displacement or Replacement Piles)
          • Installation by boring methods --- Digging a hole in the soil --- Installing or casting the pile in the hole
      • Based on Load Transfer Method
        • Point Bearing Piles --- Qu = Qp + Qs where Qs = 0 therefore, Qu = Qp
        • Friction Piles --- Qu = Qp + Qs where Qp = 0 therefore Qu = Qs
        • Compaction Piles
  2. LEC07 - Pile Foundations II

    • Design Philosophies:
      • Design must comply with two requirements for the lifetime of its service:
        • 1) Adequate safety against failure of the ground
        • 2) Adequate margin against excessive pile movement
      • 2 Design Approaches are used:
        • Global Factor of Safety Approach
        • Limit State Design Approach
    • Ultimate Capacity of Pile, Qu = Qs + Qp
      • Qp = Point Load Bearing Capacity
        • Qp = Ap x qp (where qp in = to qu in Meyerhof's equation in shallow foundations)
          • Qp in Sand
            • Qp = Ap.q.N*q <= Ap(0.5.pa.N*q.tan(phi))
          • Qp in Clay
            • Qp = Ap.cu.N*c
          • Qp in Soil
            • Qp = Qp.c` + Qp.phi` = [(Ap.q`.N*q<=Ap(0.5pa.N*q.tan.phi`))+(9Ap.c`)] --- basically the summation of Qp in clay and Qp in sand
      • Qs = Frictional Resistance of Pile
        • Qs = Summation of p.change in L.f --- and then the f changes in all the different methods
          • Qs in Sand
            • f = N.us = K.o`v.tan(soil-pile friction angle)
            • Meyerhof's
              • fav = 0.02pa(N60) - for high displacement driven piles
              • fav = 0.01paN60 - for low displacement driven piles
            • Briaud's
              • fav = 0.224pa(N60)^0.29
            • Qs = fav.p.L
          • Qs in Clay
            • wavelength method
              • fav = wavelength(o`o + 2cu)
                • cu = [(cu(1).L1) + (cu(2).L2)...]/(L)
                • o`o = [A1 + A2 ...]/(L)
            • alpha method
              • f = alpha . cu
                • alpha = from tables
            • beta method
              • f = beta . o`o
                • beta = K.tan.phi`R
                  • K = 1-sin(phi`R) --- for normally consolidated clays
                  • K = [(1 - sin(phi`R).sqrt(OCR)] --- for overconsolidated clays
            • Correlation
              • f = alpha`.fc
          • Qs in soil
      • But also keep in mind that Qu must be less than or equal to Qall,s (= Allowable structural capacity of pile)
    • Pier Foundations:
      • A raised structure typically supported by well spaces pile foundation systems
      • Types of Piers
        • Masonry piers
        • Drilled Piers
          • Concrete in Steel Shell Pier
          • Drilled Concrete Pier
          • Concrete and Steel Core in Steel Shell Pier
      • Difference between Pile and Pier
        • Method of Construction
        • Method of Load Transfer
        • Variation in Depth
        • Preference
        • Type
  3. LEC08 - Settlement of Foundations

    • Types of Settlement
      • Elastic Settlement (during or immediately after construction)
      • Consolidation Settlement (depends on the permeability of the soil under the foundation)
      • In sand; elastic and consolidation settlement occur at the same time
      • In clay: elastic settlement occurs in short time and consolidation settlement occurs in very long period of time (considered for years after construction has occured)
    • Estimation of Settlement of Shallow Foundations
      • Effect of Water Table on Settlement of Shallow Foundations
        • Se` = Se x Cw
          • Peck et, al
            • Cw = [(1)/(0.5 + 0.5 x ((Dw)/(Df + B)))] => 1
          • Teng
            • Cw = [(1)/(0.5 + 0.5 x ((Dw - Df)/(B)))] <= 2
          • Bowels
            • Cw = 2 + (Dw / (Df + B))
      • Elastic Settlement of Shallow Foundations on Sand:
        • Se(flexible) = qo (alpha x Beta`)[(1 - us^2)/(Es)] x Is x If
        • Se(rigid) = 0.93 Se(flexible)
      • Elastic Settlement of Shallow Foundations on Clay:
        • Se = (A1 x A2 ](qo x B)/Es])
    • Estimation of Settlement of Pile Foundations
      • The settlements in piles are relatively low when compared to shallow foundations
      • Under working loads, with a factor of safety of 2 - 3, the settlement is about 1% of the pile diameter
      • The total settlement of piles under a vertical working load is Qw
    • Settlement due to Primary Consolidation
      • Consolidation settlement occurs over time in saturated clayey soil subjected to an increased load cause by construction of the foundation
    • Settlement due to Secondary Consolidation
      • At the end of primary consolidation, some settlement takes place due to the plastic adjustment of soil fabrics. This stage of consolidation is called secondary consolidation.
  4. LEC09 - Geometric Design of Foundations

    • Isolated Footing:
      • Square, Rectangle etc. supporting one column or wall load
    • Combined Footing --- Supporting two or more column loads
      • Rectangular combined footing
        • When the standard footing design will extend out of the property line
        • When adjacent footings will be very close (<25cm)
        • 6 Design Steps:
          • 1) determine the area of the combined footing
          • 2) determine the location of the resultant load (taking moments about centre of column 1)
          • 3) find the length of combined footing, assuming uniform pressure, L
          • 4) check the validity of uniform load assumption
          • 5) find the extend of interior side of the combined footing, L1
          • 6) find the width of combined footing, B based on the known area
      • Trapezoid combined footing
        • 4 design steps:
          • 1) Determine the area of combined footing
          • 2) Determine the location of the resultant load
          • 3) check validity of uniform load assumption
          • 4) determine B1 and B2 by solving the system
        • Where loads are largely different in magnitude
        • Where space is tight (limited from both sides)
      • Cantilever footing (strap footing)
        • Cantilever footing construction uses a strap beam to connect an eccentrically loaded column or wall foundation to the foundation of an interior column
        • Replaces trapezoidal or rectangular combined footings when: the allowable soil bearing capacity is high and the distances between the columns are large
        • 5 Design Steps:
          • 1) determine the area of the combined footing
          • 2) determine the location of the resultant load (taking moment about centre of column 2)
          • 3) centre of gravity of two footings should coincide with the resultant load --- taking moment about centre of column 2, assuming B, Yc and hf
          • 4) Calculate L2
    • Mat or Raft Foundation
      • Supporting more than one line of column loads
      • Are used when:
        • When more than 50% of the structures footprint will otherwise be constructed as pad or strip footings
        • When the type of structure requires that the differential settlements be limited to very small values
        • When there are non-uniform soil conditions or soil where pockets of weak soil are present
      • Common types of mat Foundations:
        • a) Flat Plate
        • b) Flate plate thickened under columns
        • c) bean and slab - waffle slab
        • d) flat plates with pedestals - ribbed raft
        • e) Slab with basement walls as part of the mat
      • When water table is high, mat is placed over the piles
    • Foundation Design Considerations
      • Mat foundations can also be designed by considering shear forces and moment based on:
        • Conventional rigid method
        • Approximate flexible method
  5. LEC10 - Lateral Earth Pressure and Retaining Structures

Images and files in the map

  • Short Answer // Theory Questions
  • Short Answer // Theory Questions
  • Short Answer // Theory Questions
  • Short Answer // Theory Questions
  • Short Answer // Theory Questions

Information

Description
Mind Map on Short Answer // Theory Questions, created by Ofa Halatanu on 19/06/2018.