Scheduling Resources and Costs
Time Constrain
- Must be completed by specific date
- Leveling
- Resolve resource overallocations
- examine unbalanced use of resources
- clear peaks and valleys
Resource Smoothing
- Reduce resource demand
- use free time on schedule
- Increase resource utilization
- Reduce resource demand
Constrainsts
- Resource Constrain
- Material
- Equipment
- People
- Limited resources
- Scheduling
- Reduces slack
- Reduces flexibility
- Time is flexible
- ensures delay is minimized
- Splitting
- Resources is moved from one activity to another
- When start up and shut down costs are low
- Materialize as project is implementef
- Scheduling
- Variable time to complete
- Parallel method
- Minimum slack
- Smallest duration
- Lowest activity identification number
- Mulltiproject resource scheduling
- Overall Schedule slippage
- Ripple effect
- Can delay other projects
- Inefficient resource utilization
- Peaks and Valleys
- Resource bottlenecks
- Delays and extensions
- Managing
- Project priority queuing system
- create project office
- Centralize project management
- outsource projects
- Overall Schedule slippage
- Technical or logical
- networked sequence
- physical constraint
- affected by environmental conditions
- Resource Constrain
Time phased budget
- Baseline
- over/ under budget
- How much work is done
- Ahead/ behind schedule
- Assign work package
- One person
- Integrative system
- compare planned schedule and costs
- Baseline