Closeout Report

  1. 3.2.1 Project Summary

    • 3.2.1.1 Name/Login ID
      • Project leader , Dept. Manger and BIs
    • 3.2.1.2 Project Execution Plan
    • 3.2.1.3 ATP capital efficiency ( implemented deliverables)
    • 3.2.1.4 Approved scope change
    • 3.2.1.5 Design Deficiencies (IK/OOK)
    • 3.2.1.6 Approved Project Change Requests (PCR)
    • 3.2.1.8 Achievements and successes experienced
    • 3.2.1.9 Major issues
    • 3.2.1.10 Recommended/required Value Improvement Practices (VIPs)
    • 3.2.1.11 End-of-phase Performance Evaluation Report
    • 3.2.1.12 Average Project Quality Index
    • 3.2.1.13 Average Project Safety Index
    • 3.2.1.14 Reports and certificates
      • At Mechanical Completion
        • Monthly Project Update Report (MPU), Budget Item Summary Report (BISR), Project Completion Schedule (PCS) and Mechanical Completion Certificate (MCC)
    • 3.2.1.7 Approved Change Orders for each contract
    • 3.2.1.15 Confirmation
      • All unused drawing numbers, revision numbers and tag numbers have been returned in iPlant.
      • Issue for Construction (IFC) and As-built drawings have been submitted in iplant
  2. 3.2.2 Cost and Man-hours

    • 3.2.2.1 For the Construction Agency
      • Total planned and actual costs and man-hours Information
    • 3.2.2.2 For each Contractor
      • Total planned and actual costs and man-hours Information
    • 3.2.2.3 Other miscellaneous costs
      • Saudi Aramco construction equipment such as rented, leased and chartered vehicles
      • Miscellaneous direct costs such as living and transportation expenses IK and OOK
      • Prorates, miscellaneous reallocated costs and other indirect costs such as engineering and construction overhead.
  3. 3.2.3 Schedule and Staffing Profile

    • 3.2.3.1 Planned and actual key milestone dates
      • FEL 1 (Business Case) and FEL 2 (Study and Design Basis Scoping Paper) milestones
      • Project Proposal (FEL3) milestones
      • Detailed Design milestones
      • Procurement milestones
      • Construction milestones
    • 3.2.3.2 Critical Path Method (CPM) work schedules
      • Project Proposal, Detailed Design Procurement , Construction and Pre-commissioning , Commissioning and Start-up
      • Construction Agency (including SMP, PMC etc.) and contractor’s monthly planned and actual man-hours and histogram/staffing profile with table indicating discipline and the consolidated total man-hours
  4. 3.2.4 Materials

    • 3.2.4.1 Total material costs
    • 3.2.4.2 List of the purchase orders (PO)
    • 3.2.4.3 Provide actual data related to the quantities of the main equipment and bulk materials acquired, finally installed, and used within the project.
  5. 3.2.5 General

    • 3.2.5.1 Waivers log if applicable
    • 3.2.5.1 Waivers log if applicable
    • 3.2.5.2 List of Permits and Licensor agreement
    • 3.2.5.3 Project Records archiving and disposal
    • 3.2.5.4 Twenty (maximum) photos of the project for critical construction milestones
  6. 3.2.6 After Action Review Meetings

    • 3.2.6.2 Meeting at Final Mechanical Completion
      • Meeting participant:s
        • Construction Agency Department Manager
        • Construction Agency Department Manager
        • Proponent Operations Manager
        • Maintenance Superintendent
        • Commissioning Team Leader
        • Post Project Appraisal Team representative (Finance)
        • CPED representative, as applicable
      • Meeting will address:
        • If applicable, elements of Capital Efficiency, e.g., Operational Readiness Plan, Target Setting (final results), Final Execution KPIs (outcome), etc
        • Contracting strategy
        • Execution of contracting plan
        • Selection of construction contractors
        • Contractor performance
        • Material procurement strategy
        • Manning of the project
        • Interface with the Proponent
        • Planning for Commissioning and Start-up
        • QA/QC compliance
        • Use of Value Improving Practices
        • Other items deemed useful for improving planning and execution of future projects

Information

Description
Mind Map on Closeout Report, created by mfm-112 on 17/05/2015.
Created by
mfm-112
Views
0
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?