GoConqr has a new look! Let us know what you think.

Mind map

Capturing Requirements

ArtiB IT Consultancy Methods English

Map content

Capturing Requirements

  1. System Failures

    • Over-Budget
    • Delivered Late
    • Do not do what users really want
    • Inadequate customer requirements
      • Fault of customer and consultant
      • Do not identify real needs of customer
      • Inconsistent and incomplete
      • Expensive to alter one development starts
        • Misunderstanding left unresolved
  2. Adequate customer requirements

    • A description of what the system must provide
    • Properties the system must have
    • any constraints placed on system
      • WHAT it does, not HOW
  3. Other considerations

    • required system may be an enhancement to an existing system
    • It may have to interact with other systems
    • Customer may not be end user
    • May be constraints on system's hardware
  4. Writing Requirements

    • Natural language
    • Domain specific notation
  5. Functional and non functional

    • Functional
      • Describe what system should do
    • Non-Functional
      • Specify performance or capacity
    • Not always clear
  6. Size matters

    • Not an issue for SME IT Consultancy
    • Determining requirements grow with size of required system
  7. Requirement gathering process

    • Can the system be built? is it feasible?
    • Who are the stakeholders?
    • What is the systems operating environment

Information

Description
IT Consultancy Methods Mind Map on Capturing Requirements, created by ArtiB on 17/04/2013.
Created by
ArtiB
Views
29
Rating

Feedback

What is it about?

What do you think of the new look?

How do you like it?