PROJECT MANAGEMENT - ABC

DENISE PEASLEE PROJECT MANAGEMENT Inglês 4,0Avaliação média 4,0 de 5 (2 avaliações) 51 flashcards

Flashcards do conjunto (51)

  1. 1standards, rules, or tests by which a product, service, result, or process can be evaluatedacceptance criteria
  2. 2the process of confirming human resource availability and obtaining the team necessary to complete project assignmentsacquire project team
  3. 3a distinct, scheduled portion of work performed during the course of a projectactivity
  4. 4the realized cost incurred for the work performed on an activity during a specific time periodactual cost (AC)
  5. 5a technique for estimating the duration or cost of an activity or a project using historical data from a similar projectanalogous estimating
  6. 6factors in the planning purposes, that are considered to be true, real, or certain without proof or demonstrationassumptions
  7. 7a critical path method technique for calculating the late start and late finish dates by working backward through the schedule model from the project end datebackward pass
  8. 8the approved version of a work product that can be changed only through formal change control procedures and is used as a basis for comparisonbaseline
  9. 9a method of estimating project duration or cost by aggregating estimates of the lower level components of the WBSbottom-up estimating
  10. 10the approved estimate for the project or any work breakdown structure component or any schedule activitybudget
  11. 11the sum of all budgets established for the work to be performedbudget at completion (BAC)
  12. 12describes the necessary information from a business standpoint to determine if the project is worth the required investmentbusiness case
  13. 13a process whereby modifications to documents, deliverables, or baselines associated with the project are identified, documented, approved or rejectedchange control
  14. 14a formally chartered group responsible for reviewing, evaluating, approving, delaying or rejecting changes to the project, and for recording and documenting such decisionschange control board
  15. 15approved set of procedures that describes how modifications to the project deliverables and documentation will be managed and controlledchange control system
  16. 16a formal proposal to modify any document, deliverable or baselinechange request
  17. 17the process of completing each procurementclose procurement
  18. 18the process of finalizing all activities across all of the project process groups to formally close a project or phaseclose project or phase
  19. 19finalize all activities to formally close project or phaseclosing processes
  20. 20the process of defining, documenting, and managing stakeholder needs and requirements to meet project objectivescollect requirements
  21. 21an organizational placement strategy where project team members are physically located close to one another to improve communication, working relationships, and productivityco-location
  22. 22processes to ensure timely and appropriate planning, collection, creation, distribution, storage, retrieval, management, control, monitoring, and ultimate disposition of project informationcommunications management
  23. 23a component of the project management plan that describes how, when, and by whom information about the project will be administered and distributedcommunications management plan
  24. 24the process of obtaining seller responses, selecting a seller, and awarding a contractconduct procurements
  25. 25a collection of formally documented procedures used to identify and document, functional and physical characteristics of a product, result, service or component; control any changes; record and report each change; and support the audit to verify conformance to requirementsconfiguration management system
  26. 26a limiting factor that affects the election of a projectconstraint
  27. 27budget within the cost baseline that is allocated for identified risks that are accepted and for which contingent or mitigating responses are developedcontingency reserve
  28. 28a mutually binding agreement that obligates the seller to provide the specified product or service and obligates the buyer to pay for itcontract
  29. 29comparing actual performance with planned performance, analyzing variances, assessing trends to effect process improvements, evaluating possible alternatives, and recommending appropriate corrective action as neededcontrol
  30. 30the process of monitoring and controlling communications throughout the entire project life cycle to ensure the information needs of the project stakeholders are metcontrol communications
  31. 31the process of monitoring the status of the project to update the project costs and managing changes to the cost baselinecontrol cost
  32. 32process of managing procurement relationships, monitoring contract performance, and making changes and corrections as appropriatecontrol procurements
  33. 33the process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changescontrol quality
  34. 34the process of implementing risk response plans, tracking identified risks, monitoring residual risks, identifying new risks, and evaluating risk process effectiveness throughout the projectcontrol risk
  35. 35the process of monitoring the status of the project activities to update project progress and managing changes to the schedule baseline to achieve the plancontrol schedule
  36. 36the process of monitoring the status of the project and product scope and managing changes to the scope baselinecontrol scope
  37. 37the process of monitoring overall project stakeholder relationships and adjusting strategies and plans for engaging stakeholderscontrol stakeholder engagement
  38. 38an intentional activity that realigns performance of the project with the project management plancorrective action
  39. 39the approved version of the time-phased project budget, excluding and management reserves, which can be changed only through formal change control procedures and is used as a basis for comparing actual resultscost baseline
  40. 40processes involved in planning, estimating, budgeting, financing, funding, managing, and controlling costs so that the project can be completed within the approved budgetcost management
  41. 41a component of the project management plan that describes how costs will be planned, structured, and controlledcost management plan
  42. 42a measure of cost efficiency of budgeted resources expressed as the ratio of earned value (EV) --------------------------------- actual cost (AC)cost performance index (CPI)
  43. 43the amount of budget deficit or surplus as a given point in time expressed as follows: earned value (EV) - actual cost (AC)cost variance (CV)
  44. 44a category of contract that involves payments to the seller for all legitimate costs incurred for completed work, plus an award fee representing seller profitcost-plus-award-fee (CPAF) contracts
  45. 45a type of cost-reimbursable contract where the buyer reimburses the seller for the seller's allowable costs (allowable costs are defined by the contract) plus a fixed amount of profit (fee)cost-plus-fixed-fee (CPFF) contract
  46. 46a type of cost-reimbursable contract where the buyer reimburse the seller for the seller's allowable costs (allowable costs are defined by the contract) and the seller earns a profit if it meets defined performance criteriacost-plus-incentive-fee (CPIF) contract
  47. 47a type of contract involving payment to the seller for the seller's actual costs, plus a fee typical;y representing the seller's profitcost-reimbursable contract
  48. 48a technique used to shorten the schedule duration for the least incremental cost by adding resourcescrashing
  49. 49a schedule method that allows the project team to place buffers on any project schedule path to account for limited resources and project uncertaintiescritical chain method
  50. 50the sequence of activities that represents the longest path through the project, which determines the shortest possible durationcritical path
  51. 51a method used to estimate the minimum project duration and determine the amount of scheduling flexibility on the logical network paths within the schedule modelcritical path method (CPM)

Informações

Descrição
PROJECT MANAGEMENT (KEY WORDS) FlashCards sobre PROJECT MANAGEMENT - ABC, criado por DENISE PEASLEE em 03-08-2016.
Criado por
DENISE PEASLEE
Visualizações
245
Avaliação
Avaliação média 4,0 de 5 (2 avaliações)

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?