GoConqr has a new look! Let us know what you think.

Quiz

Materials and Methods Final Exam Review

Tyler Warford 113 questions

Take the quiz

Questions in this quiz (113)

  1. 1We discussed a number of ways to pay for construction services. Which one involved paying the general contractor a fixed dollar amount to complete the construction project?
    1. ACost plus a fee
    2. BLump sum
    3. CConstruction Manager
    4. DDesign/build
  2. 2Prior to 2000, the three model building codes most prevalent in the United States were…

    1. ANational, Uniform, and Standard
    2. BNational, Basic, and Standard
    3. CNational, International, and Basic
    4. DUniform, Basic, and Standard
  3. 3We discussed a number of ways to pay for construction services. Which one is the best fit for projects where the scope of work is not fully known at the time compensation is established?

    1. ADesign/build
    2. BLump sum
    3. CCost plus a fee
    4. DCMAR
  4. 4LEED recognizes four levels of sustainable design; Certified, Silver, Gold, and Diamond.

    1. Atrue
    2. Bfalse
  5. 5In the _________________ project delivery method, work does not begin until all design work is complete.
    1. Adesign/bid/build
    2. Bdesign/build
    3. CCMAR
    4. Dfast track
  6. 6A _____________________ code requirement contains detailed information, is simpler to implement, and provides certainty for designers and builders.
    1. Aperformance
    2. Bprescriptive
    3. Cdescriptive
    4. Dfunctioning
  7. 7Which statement below is correct? In the MasterFormat System…

    1. Aconstruction materials and systems are organized into 50 primary divisions
    2. BDivision 31 is related to earthwork
    3. CDivision 02 is related to existing conditions
    4. DDivision 04 is masonry
    5. EDivision 05 is metals
    6. FAll are correct.
  8. 8Which statement below is correct regarding the construction manager project delivery method?

    1. AIt is best suited for simple, straight forward projects
    2. BThe CM is involved in the project prior to construction
    3. CThe CM has very limited influence on the project
    4. DIt eliminates the need for contractual agreements
  9. 9Caroline Ask with the City of College Station recommended several “best management practices” related to stormwater management. One BMP was a designated concrete washout area. What is the primary reason for containing concrete washout on the project site?
    1. AConcrete contains a high sodium content
    2. BConcrete contains a low sodium content
    3. CConcrete has a high pH level
    4. DConcrete has a low pH level
  10. 10The term construction documents, as used in the textbook, refers to…

    1. Adrawings and specifications
    2. Bdrawings only
    3. Cspecifications only
    4. Dnone of the above.

Information

Description
Management Construction Quiz on Materials and Methods Final Exam Review, created by Tyler Warford on 13/12/2022.
Language
English
Views
22
Tags
constructionmanagement
Rating
No ratings yet
Rate this quiz
Rate this quiz

More on Construction Planning and Stages

Feedback

What is it about?

What do you think of the new look?

How do you like it?