  1. 1What are the main components of a cavity wall ?Two halves of a wall
    A cavity
    Wall ties
  2. 2Below ground level, what material is likely to be chosen to fill the cavity ?Concrete = this will make the wall stronger and more stable.
  3. 3Above ground level, what material is likely to be chosen to fill the cavity ?An insulating material
  4. 4At what distance should wall ties be placed ?Every 900mm horizontally
    and
    Every 450mm vertically
  5. 5What is the name given to the mortar between the courses of bricks ?Pointing
  6. 6Can you name this type of pointing ?Weather Struck PointingCan you name this type of pointing ?
  7. 7Can you name this type of pointing ?Recessed PointingCan you name this type of pointing ?
  8. 8Can you name this type of pointing ?Flush PointingCan you name this type of pointing ?
  9. 9Can you name this type of pointing ?Bucket Handled PointingCan you name this type of pointing ?

Informationen

Beschreibung
BRLevel 2 Construction (Unit 1 - Construction Technology) Karteikarten am Cavity Walls, erstellt von gareth powell am 08/02/2016.
Erstellt von
gareth powell
Aufrufe
5
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck