  1. 1What are the main components of a cavity wall ?Two halves of a wall
    A cavity
    Wall ties
  2. 2Below ground level, what material is likely to be chosen to fill the cavity ?Concrete = this will make the wall stronger and more stable.
  3. 3Above ground level, what material is likely to be chosen to fill the cavity ?An insulating material
  4. 4At what distance should wall ties be placed ?Every 900mm horizontally
    and
    Every 450mm vertically
  5. 5What is the name given to the mortar between the courses of bricks ?Pointing
  6. 6Can you name this type of pointing ?Weather Struck PointingCan you name this type of pointing ?
  7. 7Can you name this type of pointing ?Recessed PointingCan you name this type of pointing ?
  8. 8Can you name this type of pointing ?Flush PointingCan you name this type of pointing ?
  9. 9Can you name this type of pointing ?Bucket Handled PointingCan you name this type of pointing ?

Información

Descripción
BRLevel 2 (Unit 1 - Construction Technology) Construction Fichas sobre Cavity Walls, creado por gareth powell el 08/02/2016.
Creado por
gareth powell
Visitas
5
Valoración

Escríbenos

¿Sobre qué es tu mensaje?

¿Qué te parece el nuevo diseño?

¿Te gusta?