GoConqr hat ein neues Design! Sag uns, wie es dir gefällt.

Mindmap

project schedule and budget

Freda Fung Graduate Diploma in Computing Graduate diploma Englisch

Inhalt der Mindmap

project schedule and budget

  1. PMBK - project cost management.

    • focuses on the processes, procedures, and techniques to develop and manage the project budget.
    • Includes
      • Estimate Costs
        • processes to estimate the monetary resources needed to complete the project work or activities.
      • Determine Budget
        • Aggregating the individual cost for each of the project activities orwork package components to determine the cost baseline or overall project budget.
      • Control Costs
        • Updating the project’s status while monitoring the project’s budget and managing any changes to the baseline plan.
  2. tools and techniques

    • Gantt charts,
    • activity on the node (AON)
    • criticalpath analysis
    • PERT
    • precedence diagramming method (PDM
  3. DEVELOPING THE PROJECT BUDGET

    • Cost Estimation
      • five steps
        • Determining the quantity of resources that are needed
        • Defining what resources will be needed to perform the work
        • Defining the cost of using each resource
        • Calculating the cost of the task or activity
        • Ensuring that the resources are leveled
      • Using the WBS
        • This is the link between Schedule & Budget, the totals MUST match.    
        • Break work down to the lowest level
        • Estimate costs at each item of work
        • Total upwards, to specific types.
        • Use the G/L codes
        • Enter costs into the Gantt chart via the resources.
      • Other Cost
        • Direct Costs - The direct cost of labor or other resources
          • •Labour  –People  n your own department  –Other people in company  –Contracted labour     
        • Indirect Costs - The cost for covering such things as rent, utilities, insurance, etc.
          • •Overheads  –Power, etc –PM •Non-labour –Purchases –Sub-contracts –Travel –Equipment hire 
          • •General and administrative costs  –Stationary     
        • Sunk Costs - Costs incurred prior to the project such as a project that has been restarted after a failed attempt
        • Learning Curve - Often have to “Build one and throw it away” to understand a problem or a new technology
        • Prorated Costs - The idea that there is a cost associated with using a resource
        • Reserves - Contingency funds to be used at the discretion of the project manager
        • Learning curve - time to learn should beconsidered in either the project schedule or budget.
      • Resource Allocation
        • review youtube
        • review the project plan to ensure that the resources are level
          • cannot be overallocated
          • Not catching these mistakes early can have a demoralizing effect on the team and leadto unplanned (i.e., unbudgeted) costs
    • Finalizing the Project Schedule and Budget
      • The project schedule and budget may require several iterations before it is acceptable to the sponsor, the project manager, and the project team
      • Once the project schedule and project plan are accepted, the project plan becomes the baseline plan.
      • Once accepted, the project manager and project team have the authority to execute or carry out the plan
    • Total of Budget in Proposal MUST match total of the Cashflow Report !

Informationen

Beschreibung
Graduate diploma Graduate Diploma in Computing (Project Management) Mindmap am project schedule and budget, erstellt von Freda Fung am 23/06/2016.
Erstellt von
Freda Fung
Aufrufe
1
Bewertung

Feedback

Worum geht es?

Wie gefällt dir das neue Design?

Dein Eindruck