project schedule and budget

  1. PMBK - project cost management.

    • focuses on the processes, procedures, and techniques to develop and manage the project budget.
    • Includes
      • Estimate Costs
        • processes to estimate the monetary resources needed to complete the project work or activities.
      • Determine Budget
        • Aggregating the individual cost for each of the project activities orwork package components to determine the cost baseline or overall project budget.
      • Control Costs
        • Updating the project’s status while monitoring the project’s budget and managing any changes to the baseline plan.
  2. tools and techniques

    • Gantt charts,
    • activity on the node (AON)
    • criticalpath analysis
    • PERT
    • precedence diagramming method (PDM
  3. DEVELOPING THE PROJECT BUDGET

    • Cost Estimation
      • five steps
        • Determining the quantity of resources that are needed
        • Defining what resources will be needed to perform the work
        • Defining the cost of using each resource
        • Calculating the cost of the task or activity
        • Ensuring that the resources are leveled
      • Using the WBS
        • This is the link between Schedule & Budget, the totals MUST match.    
        • Break work down to the lowest level
        • Estimate costs at each item of work
        • Total upwards, to specific types.
        • Use the G/L codes
        • Enter costs into the Gantt chart via the resources.
      • Other Cost
        • Direct Costs - The direct cost of labor or other resources
          • •Labour  –People  n your own department  –Other people in company  –Contracted labour     
        • Indirect Costs - The cost for covering such things as rent, utilities, insurance, etc.
          • •Overheads  –Power, etc –PM •Non-labour –Purchases –Sub-contracts –Travel –Equipment hire 
          • •General and administrative costs  –Stationary     
        • Sunk Costs - Costs incurred prior to the project such as a project that has been restarted after a failed attempt
        • Learning Curve - Often have to “Build one and throw it away” to understand a problem or a new technology
        • Prorated Costs - The idea that there is a cost associated with using a resource
        • Reserves - Contingency funds to be used at the discretion of the project manager
        • Learning curve - time to learn should beconsidered in either the project schedule or budget.
      • Resource Allocation
        • review youtube
        • review the project plan to ensure that the resources are level
          • cannot be overallocated
          • Not catching these mistakes early can have a demoralizing effect on the team and leadto unplanned (i.e., unbudgeted) costs
    • Finalizing the Project Schedule and Budget
      • The project schedule and budget may require several iterations before it is acceptable to the sponsor, the project manager, and the project team
      • Once the project schedule and project plan are accepted, the project plan becomes the baseline plan.
      • Once accepted, the project manager and project team have the authority to execute or carry out the plan
    • Total of Budget in Proposal MUST match total of the Cashflow Report !

Informações

Descrição
Graduate diploma Graduate Diploma in Computing (Project Management) Mapa Mental sobre project schedule and budget, criado por Freda Fung em 23-06-2016.
Criado por
Freda Fung
Visualizações
1
Avaliação

Fale Conosco

Sobre o que é sua mensagem?

O que você acha do novo visual?

Você gostou?